API Pipeline Construction Inspector - API-1169 FREE EXAM DUMPS QUESTIONS & ANSWERS
EPA - Phase for containment counter measures cleanup and disposal.
Correct Answer: D
Vote an answer
Portions of piping systems to be operated at a hoop stress of more than __________ of the SMYS of the pipe shall be subjected at any point to a hydrostatic proof test equivalent to not less than 1.25 times the internal design pressure?
-25%
-30%
-80%
-50%
-None of these
-25%
-30%
-80%
-50%
-None of these
Correct Answer: A
Vote an answer
Encroachment area is where the ground disturbance occurs within.
-10 ft of centerline of existing facility
-25 ft from edge of easement
-50 ft from centerline
-50 ft from edge of easement
-10 ft of centerline of existing facility
-25 ft from edge of easement
-50 ft from centerline
-50 ft from edge of easement
Correct Answer: B
Vote an answer
Color used for surveyed reclaimed water, irrigation and slurry lines.
Correct Answer: C
Vote an answer
How shall tensile strength be computed?
-max load at failure x smallest cross-sect area
-Max load at failure / "
-Min load at failure x largest cross sect area
"/"
-max load at failure x smallest cross-sect area
-Max load at failure / "
-Min load at failure x largest cross sect area
"/"
Correct Answer: D
Vote an answer
Where would a worker look to find information on proper PPE for coding repairs?
Correct Answer: C
Vote an answer