What is the actual duration as of the status date or data date of Activity B?


Correct Answer: D
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
What day would Activity C complete if the duration of Activity A was reduced by five days?
Correct Answer: D
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Using a 1.75 cubic yard [1.34 cubic meter] bucket, how many lifts does it take to pour each 2.000-cubic foot
[56.64 cubic meter] column?
[56.64 cubic meter] column?
Correct Answer: C
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Scenario:
The entire network consists of the following activities and relationships. Activity A is twenty days long and is tied to Activity B, a ten-day activity, with a finish-to-finish tie with a lag value of five Activity B is tied to Activity C, a twenty-day activity, with a start-to-start relationship with a lag value of five.

PSP Activities Table
Scope Known about Rock-Filled Dam Project:
The dam requires river diversion and work over two or more rainy seasons. The contract is lump sum, competitively bid, and will be self-performed. The owner has attempted to shift all risk to the contractor by employing "no differing sit conditions" and "no damage for delay" clauses. There is a bonus/penalty provision of $2,500 per calendar day for early or late delivery. The early completion bonus is capped at $500,000, with no cap for late delivery penalty.
Liquidated damages end at the finish of demobilization. Indirect costs per calendar day are $2,800 for the
"normal" schedule and $3,200 for the "crashed" schedule. The winter/wet weather season is 151 days between October 15 and March 25 of each year, reduces the efficiency of the contractor's operations by 20% and costs the contractor $10,000 per day. Assume a start date of March 5, 2001 and use a 7-day work week.
The following table lists work activities as planned by the contractor.

Theoretically construct a summary activity for only those activities with a finish-to-start relationship for Activities 8001 through 10001. Using the "normal" schedule, what is the cost of this hammock?
The entire network consists of the following activities and relationships. Activity A is twenty days long and is tied to Activity B, a ten-day activity, with a finish-to-finish tie with a lag value of five Activity B is tied to Activity C, a twenty-day activity, with a start-to-start relationship with a lag value of five.

PSP Activities Table
Scope Known about Rock-Filled Dam Project:
The dam requires river diversion and work over two or more rainy seasons. The contract is lump sum, competitively bid, and will be self-performed. The owner has attempted to shift all risk to the contractor by employing "no differing sit conditions" and "no damage for delay" clauses. There is a bonus/penalty provision of $2,500 per calendar day for early or late delivery. The early completion bonus is capped at $500,000, with no cap for late delivery penalty.
Liquidated damages end at the finish of demobilization. Indirect costs per calendar day are $2,800 for the
"normal" schedule and $3,200 for the "crashed" schedule. The winter/wet weather season is 151 days between October 15 and March 25 of each year, reduces the efficiency of the contractor's operations by 20% and costs the contractor $10,000 per day. Assume a start date of March 5, 2001 and use a 7-day work week.
The following table lists work activities as planned by the contractor.

Theoretically construct a summary activity for only those activities with a finish-to-start relationship for Activities 8001 through 10001. Using the "normal" schedule, what is the cost of this hammock?
Correct Answer: B
Vote an answer
How many work days does it take to move the product from testing to sale?


Correct Answer: D
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Which of the following project planning situations is the most frequent contributor to cost overruns?
Correct Answer: C
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
The Scope of Work divides the major deliverables into smaller more manageable components for all of the following EXCEPT to:
Correct Answer: D
Vote an answer
An early start constraint dictates
Correct Answer: D
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Determine the correct formula and date for the late finish for Activity 2002.
Correct Answer: C
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
What method would be the best way to determine the most likely as-built critical path of a project that is underway, and the schedule of which has been partially progressed?
Correct Answer: A
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Assuming that you had only one crane capable of 30 lifts per day, 3 column pours requiring 28 lifts each, plus associated assorted work requiring an additional 150 lifts, what is the minimum planned working duration for this work?


Correct Answer: A
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Of the following update procedures, which is the least important in achieving an accurate forecast for completion of a construction schedule?
Correct Answer: D
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).