Autodesk Certified Professional in Revit for Electrical Design - RVT_ELEC_01101 FREE EXAM DUMPS QUESTIONS & ANSWERS
Refer to exhibit.
(The Image is presented in Imperial units: 1 In = 25 mm [Metric units rounded).)

What is the electrical designer trying to do as shown in the exhibit?
(The Image is presented in Imperial units: 1 In = 25 mm [Metric units rounded).)

What is the electrical designer trying to do as shown in the exhibit?
Correct Answer: B
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Refer to the exhibit.

An electrical designer models a cable tray in a project and decides to check the box (or Use Annot. Scale tor Single Line Fittings and change the Cable Tray Fitting Annotation Size to 1/8" (3 mm).
What is the result?
(The image is presented m Imperial units: 1 In = 25 mm (Metric units rounded].)

An electrical designer models a cable tray in a project and decides to check the box (or Use Annot. Scale tor Single Line Fittings and change the Cable Tray Fitting Annotation Size to 1/8" (3 mm).
What is the result?
(The image is presented m Imperial units: 1 In = 25 mm (Metric units rounded].)
Correct Answer: C
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Refer to exhibit.

Which two actions were used to create this light fixture schedule? (Select two.)

Which two actions were used to create this light fixture schedule? (Select two.)
Correct Answer: A,C
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
How can an arrowhead be added to a lag leader line?
Correct Answer: D
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Refer to exhibit.
(The image is presented in Imperial units: 1 In = 25 mm [Metric units rounded].)

An electrical designer is trying to add the selected three-way switch to the existing switch system "b". The designer is unable to add the switch to the switch system.
Why is this problem occurring?
(The image is presented in Imperial units: 1 In = 25 mm [Metric units rounded].)

An electrical designer is trying to add the selected three-way switch to the existing switch system "b". The designer is unable to add the switch to the switch system.
Why is this problem occurring?
Correct Answer: A
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Refer to exhibit.

In this linked architectural model, demolished walls are missing The electrical designer teams from the architect that the walls have been placed in a phase that does not exist in the host model.
Which steps should the designer lake to associate the architectural phases to their phases?

In this linked architectural model, demolished walls are missing The electrical designer teams from the architect that the walls have been placed in a phase that does not exist in the host model.
Which steps should the designer lake to associate the architectural phases to their phases?
Correct Answer: A
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Refer to exhibit.

An electrical designer expects the total connected load on the switchboard to be 4000VA. but Revit Indicates a total connected load of 3606VA. What Is the cause of the discrepancy?

An electrical designer expects the total connected load on the switchboard to be 4000VA. but Revit Indicates a total connected load of 3606VA. What Is the cause of the discrepancy?
Correct Answer: B
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).