EXIN EPI Certified Data Centre Specialist - CDCS FREE EXAM DUMPS QUESTIONS & ANSWERS

The location of a data center is just above the Arctic Circle (North Pole). The outside air temperature is never above 21°C/70°F.
Taking energy efficiency as the highest priority, which cooling system should you recommend?
Correct Answer: A Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
The air intake of the mission-critical server at the top of the rack is measuring 25 °C/77 °F.
Is this acceptable?
Correct Answer: D Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
You are allowed to use a calculator for this question. The total power consumption of the ICT equipment in a rack is 6 kW. The equipment is traditional ICT equipment with a Delta-T of approximately 11 °C / 20 °F.
Calculate the approximate CFM required to cool the equipment in the rack.
Correct Answer: C Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
The data center has been in operation for about 1 year and 2 months. The dust levels in the computer room are relatively high.
What is the most likely root cause?
Correct Answer: A Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
What mainly affects the cooling capacity of a raised floor tile?
Correct Answer: C Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Do you need to consider bullet (ballistics) protection when designing a data center?
Correct Answer: B Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Which efficiency indicator accounts for all cooling costs (installation, operation, disposal)?
Correct Answer: D Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).