The System x sales professional has researched a company whose direction is to reduce cost through automation. The sales professional is developing a proposal for the CIO that is designed to save the company money over time through reduced operational costs. To implement the solution the customer would need to make an upfront investment. What question should be asked of the CIO to determine if the sales proposal will meet the company's objective?
Correct Answer: B Vote an answer
Which of the following is a key driver of changes in the ethernet networking requirements of our clients in their data centers?
Correct Answer: C Vote an answer
A prospective PureFlex customer is also considering Cisco UCS. Which of the following would be most appropriate to assist a seller in defining Flex advantages compared to a specific Cisco UCS solution?
Correct Answer: D Vote an answer
A client asks you for a proposal including x86 servers with at least 512GB memory. Which of the following products is likely to provide the lowest cost to meet this requirement?
Correct Answer: C Vote an answer
A System x customer is finally considering virtualizing their existing x86 server farm. They are risk averse and ask their sales professional to recommend the most widely used hypervisor. Which of the following meets this customer requirements?
Correct Answer: A Vote an answer
An x86 customer is evaluating both IBM Flex Systems and UCS for their new server roll-out. The roll-out will be staged over time, eventually reaching 1,000 servers, and the customer wants to purchase the minimum amount of hardware up-front, and grow their management infrastructure as economically as possible as needed throughout the build-out. With IBM Systems Director, they understand that they can start with a relatively small server, and add CPU, memory, and disk as needed based on their growth. Which of the following describes how the customer would grow UCS manager as their environment expands?
Correct Answer: C Vote an answer
A client traditionally purchased Blades and BladeCenter H chassis from IBM. They are currently looking to refresh their datacenter and swap out their chassis and servers. The sales professional recommends they go with a Flex System Chassis. Which one of the following statements is a benefit of a Flex System Chassis over a BladeCenter H Chassis?
Correct Answer: B Vote an answer
A manufacturing customer has an IBM BladeCenter H chassis with four HX5 with MAX5 4-socket blades installed. Each blade has the optional Fibre Channel Expansion card. The customer wants redundancy and is going to install the following configuration: -- two Brocade 20-Port SAN Switch Modules -- two Nortel Networks 1/10 Gb Uplink ESM -- a redundant AMM Which of the following is the minimum number of power supplies needed for this configuration to have full redundancy?
Correct Answer: D Vote an answer
The System x sales professional is in a meeting with the CIO, VP of Infrastructure, Chief Architect, Operations Manager and the lead Systems Administrator for x86 servers. The sales professional is getting ready to present a solution for rack optimized servers. After everyone introduces themselves, what should you as the seller do to ensure a successful presentation?