Which two statements are correct when using the Oracle Enterprise stage? (Choose two.)
Correct Answer: A,C
Vote an answer
Which three statements describe a DataStage installation in a clustered environment? (Choose three.)
Correct Answer: A,B,C
Vote an answer
You changed the logic in an existing parallel shared container within your project. This shared container is used by other parallel jobs within your project. Which two actions are rue regarding this change to the parallel shared container? (Choose two.)
Correct Answer: B,C
Vote an answer
Which requirement must be met to read from a database in parallel using the ODBC Enterprise stage?
Correct Answer: B
Vote an answer
You would like to compare two versions of a job that has been copied and renamed. How would you proceed?
Correct Answer: D
Vote an answer
Which three statements are true about Transformer stage variables? (Choose three.)
Correct Answer: A,C,E
Vote an answer
Click the Exhibit button.
A parallel job is designed to Join data from two existing persisted data sets that were created in sort order using the join keys. You have optimized the job to leverage the existing sort order instead of resorting. Using the job score fragment shown in the exhibit for this job, how would you verify that this job is optimizing the sort operation?
A parallel job is designed to Join data from two existing persisted data sets that were created in sort order using the join keys. You have optimized the job to leverage the existing sort order instead of resorting. Using the job score fragment shown in the exhibit for this job, how would you verify that this job is optimizing the sort operation?
Correct Answer: C