IBM Assessment: Power Systems with POWER7 Common Technical Sales Skills -v2 - A4040-224 FREE EXAM DUMPS QUESTIONS & ANSWERS
What is a technical advantage of a POWER7+ system compared to a POWER7 system?
Correct Answer: D
Vote an answer
A customer would like to consolidate their AIX and IBM i workloads that are currently running on several POWER6 servers. They also want to consolidate storage and use Live Partition Mobility to reduce planned downtime for server maintenance.
In addition to a Storwize V70001 PowerVM Enterprise Edition and dual VIO Servers, which of the following configurations supports these requirements?
In addition to a Storwize V70001 PowerVM Enterprise Edition and dual VIO Servers, which of the following configurations supports these requirements?
Correct Answer: B
Vote an answer
Which option, available in Power 710 and 720, makes them more desirable choices for smaller workloads at better prices, when compared to Power 730 and 740?
Correct Answer: B
Vote an answer
Which of the following is required for two HMC5 to be in a redundant-HMC configuration, managing Power Systems servers?
Correct Answer: B
Vote an answer
When utilizing dual VIO Servers, what protocol simplifies management for the system administrator in a Fibre Channel SAN environment?
Correct Answer: D
Vote an answer
What distinguishes the Power 760 from Power 770, Power 780 and Power 795 systems?
Correct Answer: D
Vote an answer
A client needs assistance with managing virtual machines and energy monitoring. The client is considering implementing Systems Director.
At a minimum, which edition of Systems Director would be needed?
At a minimum, which edition of Systems Director would be needed?
Correct Answer: A
Vote an answer
A customer is implementing redundant HMCs for managing multiple Power Systems servers using the following requirements:
-2 HMCs -5 managed systems -DLPAR will be used on the managed systems -HMCs must be accessible on an open network -FSPs are only accessible by a private network
What is the minimum number of Local Area Networks needed?
-2 HMCs -5 managed systems -DLPAR will be used on the managed systems -HMCs must be accessible on an open network -FSPs are only accessible by a private network
What is the minimum number of Local Area Networks needed?
Correct Answer: A
Vote an answer
A customer with POWER 7 + 780 servers would like to contain processor related charges with Capacity on Demand for workloads which run in dedicated and shared LPARs and have pronounced seasonal peaks.
What type of Capacity on Demand (CoD) should be considered?
What type of Capacity on Demand (CoD) should be considered?
Correct Answer: B
Vote an answer