A customer is running several partitions on a Power 740 with a Storwize V7000. The server and the V7000 are in a remote data center. The customer wants to add 3 partitions running the same operating system. What is the most efficient and cost effective manner to install these new partitions?
Correct Answer: D Vote an answer
Which of the following is a method to increase fault tolerance and reduce potential outages from network equipment failures downstream from the IBM i environment?
Correct Answer: D Vote an answer
A customer needs to keep energy consumption as low as possible and is considering a POWER7+ server. In order to monitor and manage energy usage, which product is needed?
Correct Answer: A Vote an answer
Which is a value of IBM Power Systems and IBM i when compared to a typical Windows, Unix or Linux solution stack?
Correct Answer: D Vote an answer
A customer running IBM i VSR4MO on a POWERS 520 is considering purchasing a POWER7+720. What steps should be performed as part of the upgrade/migration process?
Correct Answer: D Vote an answer
A customer with a POWER5 570 is replacing the system with a POWER7+ 750. In addition to a compatible IBM i version with the necessary Technology Refresh version, which other prerequisite must be accommodated?
Correct Answer: D Vote an answer
A customer with a POWER6 520 running V5R4M5 is considering migrating to a POWER7+ 720. Which upgrade or migration method will work?
Correct Answer: C Vote an answer
A P0WER7 customer wants IBM i to host the storage for client IBM i partitions but is concerned about a single hosting partition being a single point of failure.
Which of the following would address the customer's concern?
Correct Answer: A Vote an answer