A customer is considering implementing Nova link for critical Enterprise workloads.
Where will Nova link run?
Where will Nova link run?
Correct Answer: D
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
A customer would like to add a second HMC to an environment which consists of multiple
POWER7 and POWER8 systems.
Which of the following is a requirement for both HMCs to be able to manage all the systems?
POWER7 and POWER8 systems.
Which of the following is a requirement for both HMCs to be able to manage all the systems?
Correct Answer: A
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
A customer wants to optimize their environment.
Which of the following is true about virtualization for POWER8 servers?
Which of the following is true about virtualization for POWER8 servers?
Correct Answer: C
Vote an answer
A customer would like to implement an E880 for high availability.
can the customer reduce the cost of IBM i and AIX licenses for the E880?
can the customer reduce the cost of IBM i and AIX licenses for the E880?
Correct Answer: A
Vote an answer
A customer would like to freely move processor and memory activations from one Power
E870 system to another Power E870 system.
What is required to implement this capability?
E870 system to another Power E870 system.
What is required to implement this capability?
Correct Answer: B
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
For budgeting purpose, a customer wants to set aside all the storage for a particular workload which will run on 12 LPARs in Power E870. The CIO is worried that allocating all the storage to each LPAR from the beginning can lead to lack of storage in long term.
How can Shared Storage Pools benefit this customer?
How can Shared Storage Pools benefit this customer?
Correct Answer: C
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
Which tool is recommended to assist in the design and deployment of partitions?
Correct Answer: D
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
A customer is considering the purchase of a new EB70. They plan to attach it to an existing
V70W using the low profile 8Gb Fibre Channel adapter.
Which IBM resource should be used to find the supported solution?
V70W using the low profile 8Gb Fibre Channel adapter.
Which IBM resource should be used to find the supported solution?
Correct Answer: C
Vote an answer
A customer has a 40-core E880 with 2TB of memory installed with 10 cores and lTB of memory activated. They want to move a Linux application from their x86 environment to the
E880 The application is supported on Linux on Power and requires 8 cores and 64GB of memory. The Linux team is unfamiliar with the Power hardware.
Which of the following should be proposed to add the additional resources at the lowest cost?
E880 The application is supported on Linux on Power and requires 8 cores and 64GB of memory. The Linux team is unfamiliar with the Power hardware.
Which of the following should be proposed to add the additional resources at the lowest cost?
Correct Answer: B
Vote an answer
What is the most cost-effective Capacity on Demand (CoD) offering that will allow a new analyze the effects of activating two cores on an E870 and 32GB of memory for one month?
Correct Answer: D
Vote an answer
A customer has a tape drive zoned to an 8Gb FC adapter that is dedicated to one LPAR.
Which needs to be shared between Four LPARs. Network and storage are being accessed through SEA and NPIV.
In addition to assigning the adapter to the VIOS, what else needs to be done?
Which needs to be shared between Four LPARs. Network and storage are being accessed through SEA and NPIV.
In addition to assigning the adapter to the VIOS, what else needs to be done?
Correct Answer: B
Vote an answer
A stockbroker runs their high speed trading application on a standalone Linux system.
They would like to consolidate the trading workload onto an existing VIOS managed Power
E870. A single 10Gb Ethernet adapter is used for all the existing partitions.
Which of the following satisfies the customer requirement for minimum network latency for the trading workload?
They would like to consolidate the trading workload onto an existing VIOS managed Power
E870. A single 10Gb Ethernet adapter is used for all the existing partitions.
Which of the following satisfies the customer requirement for minimum network latency for the trading workload?
Correct Answer: D
Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).