Oracle Manufacturing  and Maintenance Cloud 2019 Implementation Essentials - 1Z1-1075 FREE EXAM DUMPS QUESTIONS & ANSWERS

One of the key execution capabilities that Oracle Manufacturing Cloud offers is that you can generate and
manage work order exceptions.
Which option shows the production exception types that can be reported by the production operator?
Correct Answer: D Vote an answer
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the
Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not
the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.
Correct Answer: A,C Vote an answer
Planning Central has collected manufacturing data for a Work Order WO-2045 (Make Item AS1000), where
actual duration of work order is 2 days. Item AS1000 manufacturing lead time is 1.25 days.
A plan is run and the Work Order WO-2045 is rescheduled.
Identify the duration of the rescheduled Work Order WO- 2045.
Correct Answer: D Vote an answer
Identify four parameters that are considered in the calculation of manufacturing lead time in Oracle
Manufacturing Cloud.
Correct Answer: A,D,E,F Vote an answer
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs
executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to
prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.
Correct Answer: B,C Vote an answer
In a manufacturing cloud implementation, production operators want to perform work order updates using
Dispatch List.
Identify two tasks that the Dispatch List allows the production users to perform.
Correct Answer: A,B Vote an answer
Work order costs are computed based on material and resource transactions reported and the cost method of
the product. In a manufacturing plant, the production operator has completed a work order WO-001 ensuring
proper materials and resource transactions. The materials are costed and resources are defined with rates.
A cost accountant has created cost accounting distributions. Upon reviewing the accounting distributions of
the work order WO-001, resources charged to the work order are missing.
Identify the Concurrent Request that needs to be submitted to transfer resource charges to cost accounting.
Correct Answer: C Vote an answer
0
0
0
10