During the data migration phase, there are items having routing with up to 10,000 sequence numbers. These need to be migrated to Oracle.
What specific action needs to be performed (If any) to migrate this data Into Oracle?
What specific action needs to be performed (If any) to migrate this data Into Oracle?
Correct Answer: D
Vote an answer
You anticipate having a very large plan with many Items, Purchase Orders, and Sales Orders.
You want to plan at a detailed Item level as much as possible, but detailed Resource planning Is less Important.
Because your enterprise Is global. It Is Important to have the plan run In the shortest possible time.
Identify two aggregation settings that will help you achieve your goals.
You want to plan at a detailed Item level as much as possible, but detailed Resource planning Is less Important.
Because your enterprise Is global. It Is Important to have the plan run In the shortest possible time.
Identify two aggregation settings that will help you achieve your goals.
Correct Answer: C,D
Vote an answer
Identify the element that does NOT belong to a Demand plan from Oracle Demand Planning.
Correct Answer: E
Vote an answer
The following list contains possible places the Planning engine will check for Penalty Factors for Late Demand In an Optimized Plan:
1. At the Plan Option Level
2. Flexfield at the Item Level
3. At the System Profile Level
4. Flexfield at the Demand Level
5. Flexfield at the Organization Level
Identify the correct sequence.
1. At the Plan Option Level
2. Flexfield at the Item Level
3. At the System Profile Level
4. Flexfield at the Demand Level
5. Flexfield at the Organization Level
Identify the correct sequence.
Correct Answer: F
Vote an answer
Your client Is currently using a Constrained Plan In Production. The client states that the Inventory Turn Index remains below Its target and feels that an optimized plan would allow them to Improve their Inventory turns.
You Instruct the client that there are some additional setups required for the Optimized Plan to give meaningful results.
Identify the three setups that you would recommend as the minimum for an Optimized Plan to give credible results.
You Instruct the client that there are some additional setups required for the Optimized Plan to give meaningful results.
Identify the three setups that you would recommend as the minimum for an Optimized Plan to give credible results.
Correct Answer: A,D,F
Vote an answer
Which two actions offer a possible resolution to the exception message "Past due forecast"?
Correct Answer: A,D
Vote an answer
Exhibit.

In the Distribution Network, the RDC5 and RDC6 Regional Distribution Centers source material from the DC3 Central Distribution Center.
The matrix in the Exhibit shows allocation for a supply quantity of 300 In the first allocation bucket.
Which Fair Share Allocation method was applied by the Distribution Plan?

In the Distribution Network, the RDC5 and RDC6 Regional Distribution Centers source material from the DC3 Central Distribution Center.
The matrix in the Exhibit shows allocation for a supply quantity of 300 In the first allocation bucket.
Which Fair Share Allocation method was applied by the Distribution Plan?
Correct Answer: D
Vote an answer
Identify three correct statements about Shipping Networks.
Correct Answer: B,C,E
Vote an answer
Identify the Bucket Type used for Forecast entries for a month.
Correct Answer: A