SAP Certified Application Associate - Quality Management with SAP ERP 6.0 EHP5 - C-TPLM40-65 FREE EXAM DUMPS QUESTIONS & ANSWERS
When an inspection plan includes multiple group counter, what determines the unit of measure ?
Correct Answer: A
Vote an answer
The quality inspector check the receipt of incoming certificates in the future, they want to manage the inbox for quality certificates independently for goods receipts. What do you activate to fulfill this requirement?
Correct Answer: C
Vote an answer
What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing
Correct Answer: A
Vote an answer
You have determined a new business inspection process and need to customize a new inspection type Which of the following activities must you complete? Correct 2
Correct Answer: A,B
Vote an answer
How does the system handle equipment and functional locations in an inspection lot in calibration inspection?
Correct Answer: B
Vote an answer
Which QM master data must you maintain to separate a sample into a primary and reserve sample?
Correct Answer: C
Vote an answer
Which type of inspection point exist in the system.(3 correct ans) >/ Inspection point for Physical sample
Correct Answer: A,C,D
Vote an answer
How many times can you execute the task step of an initial sample in a stability study?
Correct Answer: D
Vote an answer
What must you do in configuration to enable defects recording during an inspection with inspection lots? Note: 2 correct answer
Correct Answer: A,C
Vote an answer