When maintaining a work center, formulas can be assigned in the scheduling view. Formulas use formula parameters for calculation. What can be the origin of the formula parameters used for scheduling? (Choose three.)
Correct Answer: A,C,E
Vote an answer
Which of the following features are offered by MRP areas in SAP ECC? (Choose two)
Correct Answer: A,C
Vote an answer
The stock/requirements list for a finished product contains only one sales order and one fixed planned order with the same quantity. The availability dates for both MRP elements are on working days. The availability date for the fixed planned order is set to a later date than the one for the sales order.
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)
However, a corresponding rescheduling exception message does not appear.
What could be the reasons? (Choose two)
Correct Answer: A,C
Vote an answer
You select the master data for production orders via production versions.
Which information is contained in a production version?
Which information is contained in a production version?
Correct Answer: B
Vote an answer
An enterprise wants to use SAP ECC requirements planning together with the NETPL procedure (net change planning in the planning horizon). The planning horizon is to be set equally for all materials by default.
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
However, some materials are to be given a different planning horizon.
What procedure would you recommend to the project team for setting the planning horizon on the system side?
Correct Answer: C
Vote an answer
In the SAP ECC system, a material is produced using production orders. The planning table for repetitive manufacturing should be used to plan line loading for this material. On the initial screen of the planning table, you select this material and then receive a message informing you that you cannot use the planning table for this material (see attached screenshot).

What could be the reason?

What could be the reason?
Correct Answer: B
Vote an answer