VMware HCI Master Specialist - 5V0-21.21 FREE EXAM DUMPS QUESTIONS & ANSWERS

An 8-Node vSAN Stretched Cluster (4+4+1) with a single disk group has a policy with PFTT=1 (mirrored across sites) and SFTT=1/FTM Mirroring (Local Protection) configured.
The administrator has been alerted that there is a problem with the cluster. The following has been observed:
* The vSAN Witness Host is offline.
* Two disk failures on two hosts have occurred in the preferred site.
This has resulted in a critical production virtual machine's vmdk becoming inaccessible.
Which step needs to be performed by the administrator to resolve the issue?
Correct Answer: B Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
An architect is tasked with designing a solution that includes the following requirements:
* The solution must support 5,000 virtual machines.
* The solution must include software defined storage.
* The deployment of the solution must be automated.
* The solution must provide storage-policy based disaster recovery for all workloads.
Which combination of three products will fulfill these requirements? (Choose three.)
Correct Answer: B,D,F Vote an answer
An administrator has received an alert indicating that a single capacity device is close to failing within the production vSAN Cluster. The administrator must now complete preemptive maintenance on the vSAN Cluster without impacting the availability of workloads or vSAN File Services.
The following information is known about the vSAN Cluster:
* vSAN 7.x Cluster
* vSAN node count: 8
* De-Duplication and Compression: Enabled.
* Encryption: Disabled
* Current Utilization: 45%
* Disk Groups: 2
* Devices per node: 2 x 400 GB SSD, 6 x 1.8 TB SSD
Which three steps should the administrator take to successfully complete the task? (Choose three.)
Correct Answer: A,B,E Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
As a part of a network hardware refresh project, all the network switches have been replaced with a newer, high-performance model. After the replacement, the company users started experiencing slowness on the applications hosted on their vSAN-backed VMs.
The vSAN administrator checked the vSAN Network Health status and noticed that the "Hosts large ping test" has failed.
What could be the cause of this performance degradation issue?
Correct Answer: A Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
An organization has two vSAN clusters managed by the same vCenter Server, each providing 100TB of storage. The first cluster runs at 75% of its storage capacity, and the second cluster runs at 50% of its storage capacity.
The company also has the following:
* An iSCSI array of 300TB. which runs at 76% of its capacity
* A NAS system of 200TB, which runs at 10% of its capacity
* A Fiber channel (FC) array of 300TB, which runs at 80% of its capacity The administrator is asked to add an additional 25TB of storage to the first cluster. The administrator is also made aware that there is no budget to purchase new hardware and that the vSAN Storage Policy Based Management must be kept in place.
Which storage option will work for this use case?
Correct Answer: C Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
An architect is working with an All-Flash vSAN configuration and will be using the Flash Caching Devices in vSAN.
Which requirement is specifically needed for these devices?
Correct Answer: D Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
A company hosts a vSAN 7 stretched cluster for all development workloads. The original sizing of a maximum of 250 concurrent workloads in the vSAN cluster is no longer sufficient and needs to increase to at least 500 concurrent workloads within the next six months.
To meet this demand, the original 8-node (4-4-1) cluster has recently been expanded to 16 nodes (8-8-1).
Which three additional steps should the administrator take to support the current growth plans while minimizing the amount of resources required at the witness site? (Choose three.)
Correct Answer: D,E,F Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).