In standby parallel systems, imperfect switching means :
I. The switch is not perfect.
II. The secondary unit is on back-up.
III. The reliability of the system is less than with perfect switching.
IV. The secondary unit has the same reliability as the primary unit.
Response:
I. The switch is not perfect.
II. The secondary unit is on back-up.
III. The reliability of the system is less than with perfect switching.
IV. The secondary unit has the same reliability as the primary unit.
Response:
Suggested Answer: C Vote an answer
by Omar at Mar 14, 2026, 01:39 AM
0
0
0
10
Comments
Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.
Report Comment
Commenting
You can sign-up / login (it's free).