Refer to the exhibit. A network administrator is troubleshooting an IPsec tunnel between two FortiGate devices. The administrator has determined that phase 1 status is up, but phase 2 fails to come up.

Based on the phase 2 configuration shown in the exhibit, which two configuration changes will bring phase 2 up? (Choose two.)

Suggested Answer: A,C Vote an answer

The key lifetime (Seconds) must match on both sides; BR1-FGT is set to 14400, so setting it to
43200 matches HQ-NGFW.
The remote address on BR1-FGT should match the HQ-NGFW's local subnet (10.0.11.0/24), but it is currently set incorrectly as 172.20.1.0/24. Changing it to 10.0.11.0/255.255.255.0 will align the Phase 2 selectors.

by Stev at Aug 30, 2026, 03:29 AM

Comments

Chosen Answer:
This is a voting comment (?) , you can switch to a simple comment.
Switch to a voting comment New
Nick name: Submit Cancel
A voting comment increases the vote count for the chosen answer by one.

Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.

0
0
0
10