Exam CISSP Topic 6 Question 163 Discussion
Actual exam question for ISC's CISSP exam
Question #: 163
Topic #: 6
Question #: 163
Topic #: 6
Which of the following is an essential step before performing Structured Query Language (SQL) penetration tests on a production system?
Suggested Answer: C Vote an answer
An essential step before performing SQL penetration tests on a production system is to validate that the target systems have been backed up. SQL penetration tests are a type of security testing that involves injecting malicious SQL commands or queries into a database or application to exploit vulnerabilities or gain unauthorized access. Performing SQL penetration tests on a production system can cause data loss, corruption, or modification, as well as system downtime or instability. Therefore, it is important to ensure that the target systems have been backed up before conducting the tests, so that the data and system can be restored in case of any damage or disruption. The other options are not essential steps, but rather optional or irrelevant steps.
Verifying countermeasures have been deactivated is not an essential step, but rather a risky and unethical step, as it can expose the system to other attacks or compromise the validity of the test results. Ensuring firewall logging has been activated is not an essential step, but rather a good practice, as it can help to monitor and record the test activities and outcomes. Confirming warm site is ready to accept connections is not an essential step, but rather a contingency plan, as it can provide an alternative site for continuing the system operations in case of a major failure or disaster. References: CISSP All-in-One Exam Guide, Eighth Edition, Chapter 9, p.
471; Official (ISC)2 CISSP CBK Reference, Fifth Edition, Chapter 7, p. 417.
Verifying countermeasures have been deactivated is not an essential step, but rather a risky and unethical step, as it can expose the system to other attacks or compromise the validity of the test results. Ensuring firewall logging has been activated is not an essential step, but rather a good practice, as it can help to monitor and record the test activities and outcomes. Confirming warm site is ready to accept connections is not an essential step, but rather a contingency plan, as it can provide an alternative site for continuing the system operations in case of a major failure or disaster. References: CISSP All-in-One Exam Guide, Eighth Edition, Chapter 9, p.
471; Official (ISC)2 CISSP CBK Reference, Fifth Edition, Chapter 7, p. 417.
by Alexander at Apr 27, 2024, 03:29 AM
0
0
0
10
Comments
Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.
Report Comment
Commenting
You can sign-up / login (it's free).