ACME Utilities would like to include their Assets (such as 'Cranes' and 'Excavators') in scheduling along with the Service Resources. As there might be a limited number of Assets for a particular job, they want those to be included in the scheduling process so that asset usage can be optimized.
How can this be achieved?
How can this be achieved?
Suggested Answer: D Vote an answer
Salesforce Field Service schedules Service Resources, not Assets. To bring physical equipment into the scheduling engine, the equipment must be modeled as a Service Resource so the engine can check its availability, capacity, and skills.
* Option D is correct. To include cranes, excavators, or any other equipment in scheduling, ACME must create Service Resource records for them (typically with a 'Resource Type' such as 'Equipment'). These records consume Field Service licenses, and once configured they participate in the candidate evaluation, capacity, and optimization just like a human technician.
* Option A is incorrect because there is no 'Use for Scheduling' Boolean on the Asset object; Assets and Service Resources are separate concepts.
* Option B is incorrect because a lookup field does not make the Asset part of the scheduling engine - it is just a reference.
* Option C is incorrect because the Dispatcher Console does not expose an 'Include Assets' toggle on the Schedule action.
* Option D is correct. To include cranes, excavators, or any other equipment in scheduling, ACME must create Service Resource records for them (typically with a 'Resource Type' such as 'Equipment'). These records consume Field Service licenses, and once configured they participate in the candidate evaluation, capacity, and optimization just like a human technician.
* Option A is incorrect because there is no 'Use for Scheduling' Boolean on the Asset object; Assets and Service Resources are separate concepts.
* Option B is incorrect because a lookup field does not make the Asset part of the scheduling engine - it is just a reference.
* Option C is incorrect because the Dispatcher Console does not expose an 'Include Assets' toggle on the Schedule action.
by Muriel at Jul 13, 2026, 06:18 AM
0
0
0
10
Comments
Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.
Report Comment
Commenting
You can sign-up / login (it's free).