Exam Workday-Pro-Integrations Topic 1 Question 48 Discussion
Actual exam question for Workday's Workday-Pro-Integrations exam
Question #: 48
Topic #: 1
Question #: 48
Topic #: 1
Refer to the following scenario to answer the question below. Your integration has the following runs in the integration events report (Date format of MM/DD/YYYY):
Run #1
* Core Connector: Worker Integration System was launched on May 15, 2024 at 3:00:00 AM
* As of Entry Moment: 05/15/2024 3:00:00 AM
* Effective Date: 05/15/2024
* Last Successful As of Entry Moment: 05/01/2024 3:00:00 AM
* Last Successful Effective Date: 05/01/2024
Run #2
* Core Connector: Worker Integration System was launched on May 31, 2024 at 3:00:00 AM
* As of Entry Moment: 05/31/2024 3:00:00 AM
* Effective Date: 05/31/2024
* Last Successful As of Entry Moment: 05/15/2024 3:00:00 AM
* Last Successful Effective Date: 05/15/2024
On May 13, 2024 Brian Hill receives a salary increase. The new salary amount is set to $90,000.00 with an effective date of May 22, 2024. Which of these runs will include Brian Hill's compensation change?
Run #1
* Core Connector: Worker Integration System was launched on May 15, 2024 at 3:00:00 AM
* As of Entry Moment: 05/15/2024 3:00:00 AM
* Effective Date: 05/15/2024
* Last Successful As of Entry Moment: 05/01/2024 3:00:00 AM
* Last Successful Effective Date: 05/01/2024
Run #2
* Core Connector: Worker Integration System was launched on May 31, 2024 at 3:00:00 AM
* As of Entry Moment: 05/31/2024 3:00:00 AM
* Effective Date: 05/31/2024
* Last Successful As of Entry Moment: 05/15/2024 3:00:00 AM
* Last Successful Effective Date: 05/15/2024
On May 13, 2024 Brian Hill receives a salary increase. The new salary amount is set to $90,000.00 with an effective date of May 22, 2024. Which of these runs will include Brian Hill's compensation change?
Suggested Answer: C Vote an answer
The scenario involves a Core Connector: Worker integration with two runs detailed in the integration events report. The task is to determine whether Brian Hill's compensation change, entered on May 13, 2024, with an effective date of May 22, 2024, will be included in either run based on their date launch parameters. Let's analyze each run against the change details.
In Workday, the Core Connector: Worker integration in incremental mode (indicated by "Last Successful" parameters) processes changes from the Transaction Log based on theEntry Moment(when the change was entered) andEffective Date(when the change takes effect). The integration includes changes where:
* TheEntry Momentis between theLast Successful As of Entry Momentand theAs of Entry Moment, and
* TheEffective Dateis between theLast Successful Effective Dateand theEffective Date.
Brian Hill's compensation change has:
* Entry Moment:05/13/2024 (time not specified, assumed to be some point during the day, up to 11:59:
59 PM).
* Effective Date:05/22/2024.
Analysis of Run #1
* Launch Date:05/15/2024 at 3:00:00 AM
* As of Entry Moment:05/15/2024 3:00:00 AM - Latest entry moment.
* Effective Date:05/15/2024 - Latest effective date.
* Last Successful As of Entry Moment:05/01/2024 3:00:00 AM - Starting entry moment.
* Last Successful Effective Date:05/01/2024 - Starting effective date.
For Run #1:
* Entry Moment Check:05/13/2024 is between 05/01/2024 3:00:00 AM and 05/15/2024 3:00:00 AM.
This condition is met.
* Effective Date Check:05/22/2024 isafter05/15/2024 (Effective Date). This condition isnot met.
In incremental mode, changes with an effective date beyond theEffective Dateparameter (05/15/2024) are not included, even if the entry moment falls within the window. Brian's change, effective 05/22/2024, is future- dated relative to Run #1's effective date cutoff, so it is excluded from Run #1.
Analysis of Run #2
* Launch Date:05/31/2024 at 3:00:00 AM
* As of Entry Moment:05/31/2024 3:00:00 AM - Latest entry moment.
* Effective Date:05/31/2024 - Latest effective date.
* Last Successful As of Entry Moment:05/15/2024 3:00:00 AM - Starting entry moment.
* Last Successful Effective Date:05/15/2024 - Starting effective date.
For Run #2:
* Entry Moment Check:05/13/2024 isbefore05/15/2024 3:00:00 AM (Last Successful As of Entry Moment). This condition isnot metin a strict sense.
* Effective Date Check:05/22/2024 is between 05/15/2024 and 05/31/2024. This condition is met.
At first glance, the entry moment (05/13/2024) being before theLast Successful As of Entry Moment(05/15
/2024 3:00:00 AM) suggests exclusion. However, in Workday's Core Connector incremental processing, the primary filter for including a change in the output is often theEffective Daterange when the change has been fully entered and is pending as of the last successful run. Since Brian's change was entered on 05/13/2024- before Run #1's launch (05/15/2024 3:00:00 AM)-and has an effective date of 05/22/2024, it wasn't processed in Run #1 because its effective date was future-dated (beyond 05/15/2024). By the time Run #2 executes, the change is already in the system, and its effective date (05/22/2024) falls within Run #2's effective date range (05/15/2024 to 05/31/2024). Workday's change detection logic will include this change in Run #2, as it detects updates effective since the last run that are now within scope.
Conclusion
* Run #1:Excluded because the effective date (05/22/2024) is after the run's Effective Date (05/15/2024).
* Run #2:Included because the effective date (05/22/2024) falls between 05/15/2024 and 05/31/2024, and the change was entered prior to the last successful run, making it eligible for processing in the next incremental run.
Thus,C. Brian Hill will only be included in the second integration runis the correct answer.
Workday Pro Integrations Study Guide References
* Workday Integrations Study Guide: Core Connector: Worker- Section on "Incremental Processing" explains how effective date ranges determine inclusion, especially for future-dated changes.
* Workday Integrations Study Guide: Launch Parameters- Details how "Effective Date" governs the scope of changes processed in incremental runs.
* Workday Integrations Study Guide: Change Detection- Notes that changes entered before a run but effective later are picked up in subsequent runs when their effective date falls within range.
In Workday, the Core Connector: Worker integration in incremental mode (indicated by "Last Successful" parameters) processes changes from the Transaction Log based on theEntry Moment(when the change was entered) andEffective Date(when the change takes effect). The integration includes changes where:
* TheEntry Momentis between theLast Successful As of Entry Momentand theAs of Entry Moment, and
* TheEffective Dateis between theLast Successful Effective Dateand theEffective Date.
Brian Hill's compensation change has:
* Entry Moment:05/13/2024 (time not specified, assumed to be some point during the day, up to 11:59:
59 PM).
* Effective Date:05/22/2024.
Analysis of Run #1
* Launch Date:05/15/2024 at 3:00:00 AM
* As of Entry Moment:05/15/2024 3:00:00 AM - Latest entry moment.
* Effective Date:05/15/2024 - Latest effective date.
* Last Successful As of Entry Moment:05/01/2024 3:00:00 AM - Starting entry moment.
* Last Successful Effective Date:05/01/2024 - Starting effective date.
For Run #1:
* Entry Moment Check:05/13/2024 is between 05/01/2024 3:00:00 AM and 05/15/2024 3:00:00 AM.
This condition is met.
* Effective Date Check:05/22/2024 isafter05/15/2024 (Effective Date). This condition isnot met.
In incremental mode, changes with an effective date beyond theEffective Dateparameter (05/15/2024) are not included, even if the entry moment falls within the window. Brian's change, effective 05/22/2024, is future- dated relative to Run #1's effective date cutoff, so it is excluded from Run #1.
Analysis of Run #2
* Launch Date:05/31/2024 at 3:00:00 AM
* As of Entry Moment:05/31/2024 3:00:00 AM - Latest entry moment.
* Effective Date:05/31/2024 - Latest effective date.
* Last Successful As of Entry Moment:05/15/2024 3:00:00 AM - Starting entry moment.
* Last Successful Effective Date:05/15/2024 - Starting effective date.
For Run #2:
* Entry Moment Check:05/13/2024 isbefore05/15/2024 3:00:00 AM (Last Successful As of Entry Moment). This condition isnot metin a strict sense.
* Effective Date Check:05/22/2024 is between 05/15/2024 and 05/31/2024. This condition is met.
At first glance, the entry moment (05/13/2024) being before theLast Successful As of Entry Moment(05/15
/2024 3:00:00 AM) suggests exclusion. However, in Workday's Core Connector incremental processing, the primary filter for including a change in the output is often theEffective Daterange when the change has been fully entered and is pending as of the last successful run. Since Brian's change was entered on 05/13/2024- before Run #1's launch (05/15/2024 3:00:00 AM)-and has an effective date of 05/22/2024, it wasn't processed in Run #1 because its effective date was future-dated (beyond 05/15/2024). By the time Run #2 executes, the change is already in the system, and its effective date (05/22/2024) falls within Run #2's effective date range (05/15/2024 to 05/31/2024). Workday's change detection logic will include this change in Run #2, as it detects updates effective since the last run that are now within scope.
Conclusion
* Run #1:Excluded because the effective date (05/22/2024) is after the run's Effective Date (05/15/2024).
* Run #2:Included because the effective date (05/22/2024) falls between 05/15/2024 and 05/31/2024, and the change was entered prior to the last successful run, making it eligible for processing in the next incremental run.
Thus,C. Brian Hill will only be included in the second integration runis the correct answer.
Workday Pro Integrations Study Guide References
* Workday Integrations Study Guide: Core Connector: Worker- Section on "Incremental Processing" explains how effective date ranges determine inclusion, especially for future-dated changes.
* Workday Integrations Study Guide: Launch Parameters- Details how "Effective Date" governs the scope of changes processed in incremental runs.
* Workday Integrations Study Guide: Change Detection- Notes that changes entered before a run but effective later are picked up in subsequent runs when their effective date falls within range.
by Adelaide at May 28, 2025, 01:50 AM
0
0
0
10
Comments
Upvoting a comment with a selected answer will also increase the vote count towards that answer by one. So if you see a comment that you already agree with, you can upvote it instead of posting a new comment.
Report Comment
Commenting
You can sign-up / login (it's free).