Prev Next Question 50/65 - 1z0-348.v2018-04-18

Which entity should you use to configure the manufacturing plant in Functional Manager?

Comments (The most recent comments are at the top.)

- Aug 10, 2019

Why not Option D. Organization ??
As per Oracle MFG Cloud,You can set an organization as a manufacturing plant in the Manage Inventory Organization Parameters page.

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Question List (65q)
Question 1: In a manufacturing plant, the work definition and rate plans...
Question 2: Your customer has multiple distribution centers and a few ma...
Question 3: You are setting up Fusion Manufacturing to support Back-to-B...
1 commentQuestion 4: A Production Supervisor queries a Work Order (WO-1025) from ...
Question 5: Your Customer has implemented Oracle Cloud Manufacturing and...
Question 6: Identify the two configurations in Supply Chain cloud applic...
Question 7: In what three ways can you set the overcompletion tolerance ...
Question 8: You have been asked to set up cost estimates for 10 differen...
Question 9: A user wants to transfer the work order status updates and r...
Question 10: A production Supervisor has noticed that Work Orders created...
Question 11: As a production supervisor, you require immediate access to ...
Question 12: A plant runs 24x7 daily using three continuous shifts of 8 h...
Question 13: Identify three types of Item Quantities displayed in the Wor...
Question 14: Identify the two capabilities that the Application Developme...
1 commentQuestion 15: Your customer runs two daily shifts in her plant: Morning Sh...
Question 16: A production Operator is executing work order in your plant....
Question 17: In a manufacturing plant, a production operator in a given s...
Question 18: Your customer has defined the work definitions. They have cr...
Question 19: A Manufacturing Engineer in a plant is creating an alternati...
Question 20: The Manufacturing Engineer, responsible for creating and mai...
1 commentQuestion 21: In your customer's manufacturing facility, different types o...
1 commentQuestion 22: The Manufacturing plant has two 8-hour shifts for the work c...
Question 23: You can generate and manage work order exceptions in Oracle ...
Question 24: Which two steps should you use to create a new Oracle Transa...
Question 25: To reduce the subassembly stock with no impact on material p...
Question 26: Identify the three changes that are allowed to be made to ac...
1 commentQuestion 27: Your customer has completed the required setup steps for aut...
Question 28: A manufacturing cloud user wants to print information availa...
Question 29: The Plant Manager informs you that they have bought several ...
Question 30: You want to use a predefined Standard Operation in a Work De...
Question 31: Your customer plans to use Oracle Representational State Tra...
Question 32: While creating an item in Product Information Management (PI...
Question 33: During a Manufacturing Cloud implementation, the customer re...
Question 34: An employee is responsible for dealing with different manufa...
1 commentQuestion 35: An order entry specialist creates a Back-to-Back order for p...
Question 36: In a manufacturing plant, two purchase components P1 and P2 ...
1 commentQuestion 37: A Work Center created a month ago is no longer in use now. Y...
Question 38: Identify two reports that provide work order cost-related in...
Question 39: The Cost Accountant has reported to the Production Superviso...
1 commentQuestion 40: You are monitoring the production status on your shop floor....
1 commentQuestion 41: A plant operates three continuous daily shifts of eight hour...
Question 42: As part of an implementation project, you have to perform se...
Question 43: A Production Operator needs to load Work Order Transactions ...
1 commentQuestion 44: Identify four parameters that are considered in the calculat...
Question 45: Identify two conditions that should be met at the same time ...
Question 46: You are reviewing the production status of your manufacturin...
Question 47: A manufacturing plant works for two shifts of 8 hours each. ...
Question 48: Identify three requirements fulfilled by nonstandard work or...
Question 49: You are in the process of defining a Standard Operation for ...
1 commentQuestion 50: Which entity should you use to configure the manufacturing p...
Question 51: One of the key execution capabilities that Oracle Manufactur...
Question 52: During a Manufacturing Cloud implementation, the Production ...
Question 53: Planning Central has collected manufacturing data for a Work...
Question 54: A Production operator in your company is required to report ...
Question 55: Your customer is a light assembly manufacturing company that...
Question 56: In a Manufacturing Cloud post production support environment...
Question 57: A customer has a distribution warehouse (DW) for After Sales...
Question 58: In a manufacturing cloud implementation, production operator...
1 commentQuestion 59: Identify the three sources from which supply chain orchestra...
Question 60: Work order costs are computed based on material and resource...
Question 61: Identify three entities that must be set up in Oracle Manufa...
Question 62: Your customer has the following business requirement. There ...
Question 63: The production user wants to report Work Order completion. I...
1 commentQuestion 64: A production operator needs to review the materials issued, ...
Question 65: Your customer wants to mass create and modify Work Definitio...