PMI.CAPM.v2020-09-14.q381

Exam Code:CAPM
Exam Name:Certified Associate in Project Management (CAPM)
Certification Provider:PMI
Free Question Number:381
Version:v2020-09-14
Rating:
# of views:269
# of Questions views:14216
Start Practice Test

Valid CAPM Dumps shared by Fast2test.com for Helping Passing CAPM Exam! Fast2test.com now offer the newest CAPM exam dumps, the Fast2test.com CAPM exam questions have been updated and answers have been corrected get the newest Fast2test.com CAPM dumps with Test Engine here:

Access Premium Version
(1090 Q&As Dumps, 40%OFF Special Discount: freecram)

LEAVE A REPLY

Your email address will not be published. Required fields are marked *

Other Version
158 viewsPMI.CAPM.v2021-03-06.q275
396 viewsVendor.CAPM.v2019-07-03.q512
419 viewsCWNP.CAPM.v2019-02-21.q471
Exam Question List
Question 1: Through whom do project managers accomplish work?...
Question 2: Project managers who lead by example and follow through on t...
Question 3: Which process involves documenting the actions necessary to ...
Question 4: What is the difference between the critical path and the cri...
Question 5: A project has an EV of 100 workdays, an AC of 120 workdays, ...
Question 6: Which activity may occur at project or phase closure?...
Question 7: A graphic display of project team members and their reportin...
Question 8: Enterprise environmental factors are an input to which proce...
Question 9: Outputs of the Control Communications process include:...
Question 10: Which statement summarizes the role of the change control bo...
Question 11: The basis of identification for current or potential problem...
Question 12: Which type of organizational structure is displayed in the d...
Question 13: Identify Stakeholders is the process of identifying all of t...
Question 14: Which quality tool incorporates the upper and lower specific...
Question 15: Progressively elaborating high-level information into detail...
Question 16: Monte Carlo is which type of risk analysis technique?...
Question 17: The project team is using their current information, abiliti...
Question 18: What is the critical chain method?...
Question 19: The definition of operations is a/an:...
Question 20: A project management office manages a number of aspects incl...
Question 21: A project had four phases, and at the end of the third phase...
Question 22: A project manager needs to tailor the Project Cost Managemen...
Question 23: Ensuring that both parties meet contractual obligations and ...
Question 24: Which of the following is a tool and technique for Estimate ...
Question 25: Which of the following is a conflict resolution technique th...
Question 26: Which of the following is an input to the Direct and Manage ...
Question 27: The formal and informal interaction with others in an organi...
Question 28: Which of the following is an information gathering technique...
Question 29: Which of the following is a strategy to deal with positive r...
Question 30: Which project manager competency is displayed through the kn...
Question 31: Typical outcomes of a project include:...
Question 32: The features and functions that characterize a result, produ...
Question 33: Which item is an example of personnel assessment?...
Question 34: The item that provides more detailed descriptions of the com...
Question 35: A project manager is estimating project activities using an ...
Question 36: Which of the following is a component of three-point estimat...
Question 37: Which written document helps monitor who is responsible for ...
Question 38: Identify Risks is part of which Process Group?...
Question 39: Retreating from an actual or potential conflict or postponin...
Question 40: Which set of tools and techniques is useful for estimating a...
Question 41: Which of the following are an enterprise environmental facto...
Question 42: Projects, programs, subsidiary portfolios, and operations ma...
Question 43: Which type of dependency is established based on knowledge o...
Question 44: Which document in the project management plan can be updated...
Question 45: Which of the following change requests can bring expected fu...
Question 46: If a project manager effectively manages project knowledge, ...
Question 47: With regard to a project manager's sphere of influence in a ...
Question 48: Projects are authorized by which of the following individual...
Question 49: What communication methods would a project manager use for o...
Question 50: A key benefit of the Manage Communications process is that i...
Question 51: A project manager needs to request outside support for a sta...
Question 52: When should Project Risk Management be conducted?...
Question 53: The project budget is set at $150,000. The project duration ...
Question 54: Which of the following terms indicates a deliverable-oriente...
Question 55: The business needs, assumptions, and constraints and the und...
Question 56: What is the schedule performance index (SPI) if the planned ...
Question 57: Reserve analysis is a tool and technique used in which proce...
Question 58: In agile projects while performing scope management, what is...
Question 59: Change request status updates are an output of which process...
Question 60: Which input to Collect Requirements is used to identify stak...
Question 61: The ways in which the roles and responsibilities, reporting ...
Question 62: In Project Resource Management, which process uses recogniti...
Question 63: Which set of competencies should a project manager have?...
Question 64: Which Process Group and Knowledge Area include the Sequence ...
Question 65: An input required to develop a preliminary project scope sta...
Question 66: The process improvement plan details the steps for analyzing...
Question 67: In a construction project schedule, what is the logical rela...
Question 68: Which of the following is TRUE about most project life cycle...
Question 69: Given the following information: - Activity A takes one week...
Question 70: Activity resource requirements and the resource breakdown st...
Question 71: Which format can a network diagram take?...
Question 72: Labor, materials, equipment, and supplies are examples of:...
Question 73: An intentional activity to modify a nonconforming product or...
Question 74: Which of the following strategic considerations often result...
Question 75: In the Initiating Process Group, at what point does the proj...
Question 76: Which provides the basic framework for managing a project?...
Question 77: A project is in progress and about to move to a different ph...
Question 78: A project manager called for a team meeting to estimate the ...
Question 79: Which tool is used to develop technical details within the p...
Question 80: Which process identifies whether the needs of a project can ...
Question 81: Which is a list of organizational systems that may have an i...
Question 82: An output of Control Schedule is:...
Question 83: The technique of subdividing project deliverables into small...
Question 84: Which of the following is an input to the Plan Risk Response...
Question 85: As part of a mid-project evaluation, the project sponsor has...
Question 86: The project manager is dividing the project scope into small...
Question 87: How is the Project Scope Management process different in agi...
Question 88: The individual or group that provides resources and support ...
Question 89: In which process might a project manager use risk reassessme...
Question 90: Which of the following investigates the likelihood that each...
Question 91: A required input for Create WBS is a project:...
Question 92: The risk management team of a software project has decided t...
Question 93: The initial development of a Project Scope Management plan u...
Question 94: A project manager is determining the amount of contingency n...
Question 95: The iterative process of increasing the level of detail in a...
Question 96: In a preliminary meeting for a project, team members decide ...
Question 97: An output of the Manage Stakeholder Engagement process is:...
Question 98: Which of the following involves making information available...
Question 99: Which Project Management Process Group includes Collect Requ...
Question 100: The probability and impact matrix is primarily used to:...
Question 101: Inputs to the Plan Risk Management process include the:...
Question 102: Which of the following documents are created as part of Proj...
Question 103: Which of the following is a tool and technique used in all p...
Question 104: Which defines the portion of work included in a contract for...
Question 105: Which stakeholder approves a project's result?...
Question 106: A project manager held a meeting and listed all team members...
Question 107: What output of the Conduct Procurements process is also an i...
Question 108: What are the components of the "triple constraint "?...
Question 109: Those who enter into a contractual agreement to provide serv...
Question 110: Which type of dependency used in the Sequence Activities pro...
Question 111: How can a project manager determine if the project activitie...
Question 112: What is a deliverable-oriented, hierarchical decomposition o...
Question 113: Which of the following can a project manager use to represen...
Question 114: What are the four management processes included in the Proje...
Question 115: Which item is an input to the Define Activities process?...
Question 116: Projects can intersect with an organization's operations at ...
Question 117: A project manager of a civil construction project is trying ...
Question 118: The cost performance baseline is typically displayed in the ...
Question 119: Which conflict resolution technique searches for solutions t...
Question 120: In a functional organization, the director of an important s...
Question 121: Types of internal failure costs include:...
Question 122: In which Process Group are lessons learned documented?...
Question 123: To please the customer, a project team member delivers a req...
Question 124: A project report completed an earned value (EV) of US $45 fo...
Question 125: What scope definition technique is used to generate differen...
Question 126: At which point of the project is the uncertainty the highest...
Question 127: In a project using agile methodology, who may perform the qu...
Question 128: Which of the following helps to ensure that each requirement...
Question 129: Which of the following processes are part of the Project Int...
Question 130: Job satisfaction, challenging work, and sufficient financial...
Question 131: Which Process Group typically consumes the bulk of a project...
Question 132: A project manager needs to demonstrate that the project meet...
Question 133: Which is the order of steps in the Procurement Management pr...
Question 134: What type of project structure is a hierarchically organized...
Question 135: Risk responses reflect an organization's perceived balance b...
Question 136: Which activity involves ensuring that the composition of a p...
Question 137: Which of the following is an output from Control Scope?...
Question 138: What is the name of a graphic display of project team member...
Question 139: Another name for an Ishikawa diagram is:...
Question 140: Requirements documentation, requirements management plan, an...
Question 141: An output of the Perform Integrated Change Control process i...
Question 142: A method to manage stakeholder expectations in the scope sta...
Question 143: Which of the following is an output of the Conduct Procureme...
Question 144: The Agile principle "welcome changing requirements, even lat...
Question 145: Which of the following is an example of the objective of a q...
Question 146: A new project manager wishes to recommend creating a project...
Question 147: What is the purpose of tailoring in project management?...
Question 148: The planned work contained in the lowest level of work break...
Question 149: A full-time project manager with low to moderate authority a...
Question 150: Quality metrics are an output of which process?...
Question 151: One of the key benefits of the Plan Human Resource Managemen...
Question 152: Which of the following correctly describes when organization...
Question 153: Which of the following is an example of a technique used in ...
Question 154: Within project integration management, the statement of work...
Question 155: The project manager and the project team are having a meetin...
Question 156: A Pareto chart is a specific type of:...
Question 157: Which process uses occurrence probability and impact on proj...
Question 158: Which task will a project manager undertake while conducting...
Question 159: What are the identified risks for doing excessive decomposit...
Question 160: Analytical techniques are a tool and technique of which proc...
Question 161: Which process involves defining, preparing, and coordinating...
Question 162: In which project cost management process is work performance...
Question 163: The CPI is .92, and the EV is US$172,500.What is the actual ...
Question 164: Which of the following is a tool or technique used in the De...
Question 165: Which of the following schedule network analysis techniques ...
Question 166: Success is measured by benefits realization for a:...
Question 167: Soft logic is also known as what type of dependency?...
Question 168: Change requests are processed for review and disposition acc...
Question 169: Which of the following is an output of the Perform Integrate...
Question 170: According to the PMI Talent Triangle, leadership skills rela...
Question 171: Which of the following outputs from the Control Schedule pro...
Question 172: A project manager is formalizing acceptance of the completed...
Question 173: A risk that arises as a direct result of implementing a risk...
Question 174: What happens to a stakeholder's project influence over time?...
Question 175: The following is a network diagram for a project. (Exhibit) ...
Question 176: Resource calendars are included in the:...
Question 177: Which of the following is a category of organizational proce...
Question 178: Who is responsible for determining which processes from the ...
Question 179: Which is a tool or technique used in Define Scope?...
Question 180: Which estimating technique uses the actual costs of previous...
Question 181: The PV is $1000, EV is $2000, and AC is $1500. What is CPI?...
Question 182: A benefit of using virtual teams in the Acquire Project Team...
Question 183: Which of the following buffers protects the target finish da...
Question 184: Which of the following is an input to the Perform Qualitativ...
Question 185: The project manager has the following information about the ...
Question 186: A measure of cost performance that is required to be achieve...
Question 187: Which factors should be considered for cross-cultural commun...
Question 188: A new project has been set. Four main stakeholders besides t...
Question 189: Which of the following statements is true regarding project ...
Question 190: Which is an example of leveraging evolving trends and emergi...
Question 191: Which type of analysis is used as a general management techn...
Question 192: Which process is responsible for monitoring the status of th...
Question 193: A company must implement sales software because it is openin...
Question 194: A project has an estimated duration of 10 months with a tota...
Question 195: Under which circumstances should multiple projects be groupe...
Question 196: The project scope statement and resource calendars are input...
Question 197: Which activity is an input to the Conduct Procurements proce...
Question 198: The project manager is using co-location and providing train...
Question 199: The zero duration of milestones in project planning occurs b...
Question 200: To which process is work performance information an input?...
Question 201: A project manager requesting industry groups and consultants...
Question 202: Which of the following is the correct network diagram for th...
Question 203: The following is a network diagram for a project. (Exhibit) ...
Question 204: What does an S-curve from a Monte Carlo analysis show?...
Question 205: What causes replanning of the project scope?...
Question 206: What organizational asset can influence the Plan Risk Manage...
Question 207: Stakeholders can be identified in later stages of the projec...
Question 208: An input to the Control Quality process is:...
Question 209: Which input provides suppliers with a clear set of goals, re...
Question 210: An imposed date for completion of the project by the custome...
Question 211: Which standard examines an enterprise's project management p...
Question 212: Which enterprise environmental factors are considered during...
Question 213: Projects are separated into phases or subprojects; these pha...
Question 214: What type of reward can hurt team cohesiveness?...
Question 215: At the start of a typical project life cycle, costs are:...
Question 216: Which Define Activities tool or technique is used for dividi...
Question 217: What is the primary benefit of meeting quality requirements?...
Question 218: The Monitoring and Controlling Process Group includes proces...
Question 219: Project Scope Management is primarily concerned with:...
Question 220: Creating the project scope statement is part of which proces...
Question 221: Tools and techniques used in Direct and Manage Project Work ...
Question 222: Which type of dependency is legally or contractually require...
Question 223: Which of the following correctly explains the term "progress...
Question 224: Which of the following is an output of Define Scope?...
Question 225: A project manager is in the process of working with stakehol...
Question 226: The process for performing variance analysis may vary, depen...
Question 227: The chart below is an example of a: (Exhibit)...
Question 228: An input to Close Project or Phase is:...
Question 229: Which of the following is a tool or technique used in the Ac...
Question 230: Which of the following is an input to Control Scope?...
Question 231: The component of the risk management plan that documents how...
Question 232: Which tool or technique allows a large number of ideas to be...
Question 233: In which process is a project manager identified and given t...
Question 234: The primary purpose of the stakeholder register is to:...
Question 235: Which of the following methods of performance review examine...
Question 236: What is the order of the stages of project team development?...
Question 237: Which of the following statements best describes the influen...
Question 238: When is a project finished?
Question 239: Assigned risk ratings are based upon:...
Question 240: What is the number of stakeholders, if the project has 28 po...
Question 241: Which statement about accepted deliverables is correct?...
Question 242: A weighting system is a tool for which area of Conduct Procu...
Question 243: A project manager has created an issue log to document issue...
Question 244: The process of prioritizing risks for further analysis or ac...
Question 245: A functional manager is delegating a key project to a projec...
Question 246: What is a hierarchically organized depiction of the identifi...
Question 247: When painting a bedroom, preparing the walls can be done whi...
Question 248: An important project stakeholder has low risk tolerance. Whi...
Question 249: Which Control Scope input is compared to actual results to d...
Question 250: Which of the following is a schedule network analysis techni...
Question 251: Which piece of information is part of the WBS Dictionary?...
Question 252: The run chart created during the Perform Quality Control pro...
Question 253: Which is a communication method used in the Report Performan...
Question 254: The cost of nonconformance in a project includes:...
Question 255: Which tool or technique of the Define Activities process all...
Question 256: Which of the following is a means of reaching a group decisi...
Question 257: Which of the following strategies is used to deal with risks...
Question 258: Which statement correctly describes the value of a business ...
Question 259: Which type of project life cycle uses an iteration plan?...
Question 260: Cost of quality (COQ) refers to total cost of/to:...
Question 261: A project's purpose or justification, measurable project obj...
Question 262: Which type of chart is a graphic representation of a process...
Question 263: Which schedule development technique modifies the project sc...
Question 264: To which knowledge area does the Collect Requirements proces...
Question 265: Which knowledge area includes the processes to identify, def...
Question 266: The document that guides project execution, monitoring and c...
Question 267: Which Knowledge Area is concerned with the processes require...
Question 268: Which of the following is an output of the Plan Quality proc...
Question 269: A project manager should communicate to stakeholders about r...
Question 270: A tool and technique used during the Perform Qualitative Ris...
Question 271: A temporary endeavor that creates a unique product or servic...
Question 272: Which components of the project can be updated as a result o...
Question 273: What tool and technique is used to determine whether work an...
Question 274: PMBOI Guide is a standard that describes:...
Question 275: In the Develop Project Team process, which of the following ...
Question 276: Which of the following is a tool and technique used in the D...
Question 277: The degree, amount, or volume of risk that an organization o...
Question 278: The Verify Scope process is primarily concerned with:...
Question 279: The purpose of the Project Communications Management Knowled...
Question 280: Which tool or technique is used in the Plan Scope Management...
Question 281: Which can be used to determine whether a process is stable o...
Question 282: During which process group is the quality policy determined?...
Question 283: Which process determines the risks that might affect the pro...
Question 284: What are the key components of the communication model?...
Question 285: Which of the following sets are inputs to the Collect Requir...
Question 286: Using parametric estimating, if an assigned resource is capa...
Question 287: In order to detect quality issues earlier in the project lif...
Question 288: Prioritizing risks for further analysis or action by assessi...
Question 289: Which type of contract is most commonly used by buying organ...
Question 290: Lessons learned are created and project resources are releas...
Question 291: A project manager who communicates to the project team thoug...
Question 292: Which group creativity technique asks a selected group of ex...
Question 293: Which are required to create the schedule management plan?...
Question 294: The risk response strategy in which the project team acts to...
Question 295: The project governance approach should be described in the:...
Question 296: The project charter is an input to which process?...
Question 297: Variance and trend analysis is a tool and technique used in ...
Question 298: Which of the following lists represents the outputs of the M...
Question 299: Lessons learned documentation is gathered during which of th...
Question 300: Which illustrates the connection between work that needs to ...
Question 301: Grouping the stakeholders based on their level of authority ...
Question 302: The procurement requirements for a project include working w...
Question 303: A tool and technique used during the Define Scope process is...
Question 304: The project manager is working in an agile/adaptive environm...
Question 305: Which input to the Identify Stakeholders process provides in...
Question 306: Which tool or technique is used to develop the human resourc...
Question 307: Which process involves aggregating the estimated costs of th...
Question 308: Sending letters, memos, reports, emails, and faxes to share ...
Question 309: Which is an enterprise environmental factor?...
Question 310: An input used in developing the communications management pl...
Question 311: Which project documents can determine the budget?...
Question 312: An example of a group decision-making technique is:...
Question 313: Which of the Project Time Management processes analyzes acti...
Question 314: Which stakeholder communicates with higher levels of managem...
Question 315: Which of these is true of a project schedule?...
Question 316: A project manager is working on an estimate. The project tea...
Question 317: Due to today's competitive global market, organizations requ...
Question 318: Which project risk listed in the table below is most likely ...
Question 319: What are the inputs of the Estimate Costs process?...
Question 320: A project manager is monitoring and recording results of exe...
Question 321: The following chart contains information about the tasks in ...
Question 322: In which sphere of influence is the project manager demonstr...
Question 323: Managing procurement relationships and monitoring contract p...
Question 324: Which process is included in the Project Integration Managem...
Question 325: Which of the following set of elements is part of an effecti...
Question 326: Which process involves subdividing project deliverables and ...
Question 327: The ability to influence cost is greatest during which stage...
Question 328: Organizational process assets can be divided into which of t...
Question 329: Which is an output of the Collect Requirements process?...
Question 330: The Perform Quality Assurance process occurs in which Proces...
Question 331: Which technique is utilized in the Control Schedule process?...
Question 332: Which of the following characteristics are found in a functi...
Question 333: Information collected on the status of project activities be...
Question 334: Managing ongoing production of goods and services to ensure ...
Question 335: In the Estimate Activity Durations process, productivity met...
Question 336: Which tool and technique is used in Conduct Procurements?...
Question 337: A project charter is an output of which Process Group?...
Question 338: Which item is a formal proposal to modify any document, deli...
Question 339: Which is a tool used in monitoring and controlling project w...
Question 340: Which are the competing constraints that a project manager s...
Question 341: The project manager implemented the stakeholder engagement p...
Question 342: An effective technique for resolving conflict that incorpora...
Question 343: Configuration identification, configuration status accountin...
Question 344: If you are using an Ishikawa diagram to determine the root c...
Question 345: A firm contracted an event management company to conduct the...
Question 346: Which characteristic do projects and operational work share ...
Question 347: Control charts, flowcharting, histograms, Pareto charts, and...
Question 348: When project requirements are documented in user stories the...
Question 349: A project conducts regular standup meetings to keep everyone...
Question 350: The project management processes presented in the PMBOK Guid...
Question 351: Which process documents the business needs of a project and ...
Question 352: The Process Group that involves coordinating people and reso...
Question 353: What is the function of a Project Management Office (PMO)?...
Question 354: The focus on continuous communication with all stakeholders,...
Question 355: In a typical project, project managers spend most of their t...
Question 356: Which process develops options and actions to enhance opport...
Question 357: Which of the following is an input to the Develop Project Ch...
Question 358: The diagram below is an example of a: (Exhibit)...
Question 359: In which type of contract are the performance targets establ...
Question 360: The component of the human resource management plan that inc...
Question 361: Which is an input to the Scope Verification Process?...
Question 362: What is both an input and output of the Control Quality proc...
Question 363: The lowest level normally depicted in a work breakdown struc...
Question 364: Documented identification of a flaw in a project component t...
Question 365: Which earned value management (EVM) metric is a measure of t...
Question 366: Which tool or technique is used to manage change requests an...
Question 367: Which of the following is an output of the Distribute Inform...
Question 368: Which characteristic is unique to project work and does not ...
Question 369: Co-location is a tool and technique of:...
Question 370: The project manager needs to review the templates in use. Th...
Question 371: Taking out insurance in relation to risk management is calle...
Question 372: Which process in Project Time Management includes reserve an...
Question 373: Which schedule network analysis technique modifies the proje...
Question 374: Which is the tool or technique that is used to obtain the li...
Question 375: The three processes of Project Cost Management are:...
Question 376: If the most likely duration of an activity is five weeks, th...
Question 377: When addressing roles and responsibilities, which item ensur...
Question 378: Which process should be conducted from the project inception...
Question 379: The risk shared between the buyer and seller is determined b...
Question 380: Which group of inputs will a project manager use during the ...
Question 381: Perform Quality Control is accomplished by:...