ISEB BCS Certified Tester Foundation Level 2011 syllabus - BH0-010 FREE EXAM DUMPS QUESTIONS & ANSWERS

Which of the following account for most of the failures in a system?
Correct Answer: A Vote an answer
Given the following flow chart diagram:

What is the minimum number of test cases required for 100% statement coverage and
100% decision coverage, respectively?
Correct Answer: C Vote an answer
Which of the following is a MAJOR activity of test control?
Correct Answer: D Vote an answer
Which of the following BEST describes a keyword-driven testing approach?
Correct Answer: C Vote an answer
Which of the following statements is true?
Correct Answer: A Vote an answer
A failure has occurred during system testing and incident report must be raised. The following attributes are available for the report:
a) Tester name.Tester? name.
b) Date raised.
c) Priority (to fix).
d) Severity (impact on the system).
e) Expected Results.
f) Actual Results.
g) Test case specification identifier.
h) Failing software function.
i) Tester recommendations.
Which attributes would be the MOST effective to enable determination of WHEN the incident should be fixed and HOW MUCH effort might be required to apply the fix?
Correct Answer: D Vote an answer

The above table shows 6 test procedures (P to U) that must now be entered into a test execution schedule. Business severity is regarded as the most important element in determining the sequence of the test procedures, but other dependencies must also be taken into consideration. Regression testing can only be run once all other tests have completed.
Which of the following represents the MOST effective sequence for the test execution schedule (where the first entry in the sequence is the first procedure to be run, the second entry is the second to be run and so on)?
Correct Answer: D Vote an answer
Which statement is a valid explanation as to why black-box test design techniques can be useful?
Correct Answer: C Vote an answer
Which of the following activities would NORMALLY be undertaken during test planning?
a) Scheduling test analysis and design.
b) Designing Test Conditions.
c) Monitoring test progress.
d) Identifying the objectives of testing.
e) Evaluating test tools.
f) Selecting test metrics for monitoring and control.
Correct Answer: C Vote an answer