You deploy a new database application to a SQL Server 2008 instance on a server that has 4 processor
cores and 64 GB of RAM. The application uses partitioned tables.
During testing, deadlocks occasionally occur on queries that are attempting to read data.
You find out that the deadlocks are related to the table partitions.
You need to ensure that the application executes without deadlocks for the read queries.
You also need to ensure that dirty reads do not occur.
What should you do? (More than one answer choice may achieve the goal. Select the BEST answer.)
Correct Answer: C Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
You are a professional level SQL Sever 2008 Database Administrator.
A new database will be deployed to the instance.
Regular inserts and updates should be subjected by the database. There will be multiple schemas on the
database.
A great number of read-only reference data should be contained by one of the schemas.
The physical database structure should be designed for optimal backup performance.
Which action should you perform?
Correct Answer: D Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
You administer a SQL Server 2008 infrastructure.
Your company requires capacity planning information.
You need to design a long-term infrastructure monitoring strategy.
Which two tasks should you include in your design? (Each correct answer presents part of the solution. Choose two.)
Correct Answer: A,D Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
You administer a SQL Server 2008 infrastructure.
The instance contains a database required for the day-to-day business of your company. Users experience slow response time when they execute reports.
You plan to design a performance monitoring strategy that captures and stores the following data:
Executed Transact-SQL statements and query activity.
Blocking and deadlock information.
Counters for disk, CPU, and memory.
You need to implement the monitoring process by using the minimum amount of administrative effort.
What should you do?
Correct Answer: C Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
You administer four SQL Server 2008 instances. Each instance hosts a single database application.
You plan to migrate all four instances to a new SQL Server failover cluster. The four instances are configured as shown in the following table.
Instance Name Configuration:
Instance 1 8 processors that have 16-GB RAM Instance 2 4 processors that have 8-GB RAM Instance 3 2 processors that have 16-GB RAM Instance 4 4 Processors that have 8-GB RAM
The four instances are fully optimized and have no spare CPU cycles or extra memory. The new cluster will host all four databases on a single virtual cluster IP address. You need to ensure that the new cluster is configured to handle the workload of all the database applications by using the minimum amount of hardware resources.
Which cluster configuration should you use?
Correct Answer: D Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
You are a professional level SQL Sever 2008 Database Administrator in an international corporation named Wiikigo.
You are experienced in managing databases in an enterprise-level organization,optimizing and sustaining the database life cycle. In the company, your job is to implement solutions on security, troubleshooting, deployment and optimization.
A SQL Server 2008 infrastructure is managed by you. A corporate backup and recovery strategy that has to be validated is designed.
You are required to make sure that any single database can be restored successfully from a severe failure, and during the restoration, a backup data center should not be required in a different location.
Which three actions should be contained by your solution? (Choose more than one)
Correct Answer: A,B,C Vote an answer
Explanation: Only visible for FreeCram members. You can sign-up / login (it's free).
You are a professional level SQL Sever 2008 Database Administrator.
They are respectively named Ins01, Ins02, Ins03 and Ins04. A single database application is hosted by each instance. All four instances should be removed to a new SQL Server failover cluster. You can see the configuration of the four instances from the table listed below:

All the four instances are sufficiently optimized, and there are no spare CPU cycles or extra memory in
the instances.
All four databases will be hosted by the new cluster on a single virtual cluster IP address.
Since you are the technical support, you are required to set the new cluster to handle the workload of all the database applications with the least amount of hardware resources.
From the four cluster configuration, which one should be utilized?