In MDA practice, transformations from PIM to PSM-------------------- (Choose TWO.)
Correct Answer: B,E
Vote an answer
The basic time model consists of six (6) entities. Five of the six are Physical Time, Clock, PhysicalInstant,
TimeValue, Duration. What is the sixth one?
TimeValue, Duration. What is the sixth one?
Correct Answer: A
Vote an answer
Which statement describes role of QoS in modeling the requirements of a component?
Correct Answer: B
Vote an answer
Which two of these correctly characterise "end to end" predictability in a fixed priority CORBA system?
(Choose TWO)
(Choose TWO)
Correct Answer: B,D
Vote an answer
For the Server Declared Priority Model, which statements are true? (Choose two)
Correct Answer: A,B
Vote an answer
Choose the three valid return codes for class operations at the PIM level.
Correct Answer: A,C,D