Get May-2025 Dumps to Pass your CTS-D Exam with 100% Real Questions and Answers
Updated Exam CTS-D Dumps with New Questions
AVIXA CTS-D - Design Exam Syllabus Topics:
| Topic | Weight |
|---|---|
| Duty A: Conducting a Needs Assessment | 16.8% |
| Task 1: Identify Decision-makers and Stakeholders | 1.6% |
| Task 2: Identify Skill Level of End Users | 2.4% |
| Task 3: Educate AV Clients | 1.6% |
| Task 4: Review Client Technology Master Plan | 3.2% |
| Task 5: Identify Client Expectations | 4% |
| Task 6: Identify Scope of Work | 4% |
| Duty B:Coordinating with Other Professionals to Develop Project Documentation | 23.2% |
| Task 1: Review A/E (architectural and engineering) drawings | 4% |
| Task 2: Coordinate with architectural/interior design professionals | 4% |
| Task 3: Coordinate with Mechanical Professionals | 1.6% |
| Task 4: Coordinate with Structural Professionals | 1.6% |
| Task 5: Coordinate with Electrical Professionals | 3.2% |
| Task 6: Coordinate with lighting professionals | 2.4% |
| Task 7: Coordinate with IT and network security professionals | 4.0% |
| Task 8: Coordinate with acoustical professionals | 1.6% |
| Task 9: Coordinate with life safety and security professionals | 0.8% |
| Duty C: Developing AV Designs | 48% |
| Task 1: Create Draft AV Design | 10.4% |
| Task 2: Confirm site conditions | 8% |
| Task 3: Produce AV infrastructure drawings | 12% |
| Task 4: Produce AV system drawings | 12% |
| Task 5: Finalize Project Documentation | 5.6% |
| Duty D:Conducting Project Implementation Activities | 12% |
| Task 1: Participate in Project Implementation Communication | 3.2% |
NEW QUESTION # 70
Both __________ use transition-minimized differential signaling to transmit high-speed serial data.
Response:
- A. DVI and HDMI
- B. superMHL and DisplayPort
- C. DVI and DisplayPort
- D. HDMI and DisplayPort
Answer: A
NEW QUESTION # 71
Considering a 2400 W lighting dimmer is available, the design load for the system should not exceed:
Response:
- A. 1920 watt
- B. 1750 watt
- C. 1300 watt
- D. 2400 watt
Answer: A
NEW QUESTION # 72
An image constraint token onscreen indicates a problem with __________.
Response:
- A. HDCP
- B. UHDTV
- C. EDID
- D. HDMI
Answer: A
NEW QUESTION # 73
When lighting a room for videoconferencing, the Illuminating Engineering Society recommends that fluorescent light sources have a correlated color temperature of __________.
Response:
- A. 2000 to 2500 K
- B. 5000 to 5500 K
- C. 3000 to 3500 K
- D. 4000 to 4500 K
Answer: C
NEW QUESTION # 74
The threshold of human hearing is 0 dB SPL at what kHz?
Response:
- A. 10 kHZ
- B. 3 kHz
- C. 1 kHz
- D. 0 kHz
Answer: C
NEW QUESTION # 75
Contrast ratio should be measured from __________ locations within the viewing area.
Response:
- A. Two
- B. Four
- C. Five
- D. All
Answer: C
NEW QUESTION # 76
Why might you recommend to an AV client to set up a dynamic host configuration protocol (DHCP) server system?
Response:
- A. No acknowledgement of delivery increases speed
- B. More secure server set up
- C. It is a static address system
- D. Reduced possibility of address duplication
Answer: D
NEW QUESTION # 77
You need to project an image that has a 4:3 aspect ratio. You measure the screen height and determine that it is 2,286 mm high and 3,048 mm wide. Can you use this screen for the 4:3 image?
Response:
- A. No
- B. All of the above
- C. Yes
- D. Not enough information to determine
Answer: C
NEW QUESTION # 78
TCP transport should be used instead of UDP transport when __________.
Response:
- A. Data accessibility is more important than security of the data transmission
- B. Speed and continuity of transmission are more important than guaranteed delivery or accuracy of data
- C. Guaranteed delivery and quality of the data is more important than the speed or continuity of the transmission
- D. Security of the data transmission is more important than data accessibility
Answer: C
NEW QUESTION # 79
When creating a schematic diagram of audio signal flow for a project, what must be included in the diagram?
Response:
- A. Conduit runs, pull boxes, bends
- B. Microphones, mixers, switchers, routers, and processors
- C. Construction materials, wall panels, acoustic tiles
- D. Inputs, outputs, equipment rack locations, ceiling venting
Answer: B
NEW QUESTION # 80
In a converged network, where 70 percent of the bandwidth capacity is available and 30 percent of the available capacity is available for streaming, what percentage of the network's rated capacity is available for streaming?
Response:
- A. 50 percent
- B. 70 percent
- C. 21 percent
- D. 30 percent
Answer: C
NEW QUESTION # 81
The layout of a distributed loudspeaker system needs to be calculated using the formula for partial (minimum) spacing of loudspeakers. Which button on a specific calculator is required?
Response:
- A. Divide
- B. STO
- C. Square root
- D. 10^x
Answer: C
NEW QUESTION # 82
How do you confirm the AV System has been built and delivered as per the client's scope?
Response:
- A. Training has been completed with end users along with turnover of O&M Manuals.
- B. Compare the As-Built drawings and commissioning report to the performance specifications.
- C. Generate an RFI to the architect or general contractor.
- D. Confirm with the client or owner that warranty documentation has been received.
Answer: B
NEW QUESTION # 83
For a project in Europe, calculate the circuit requirements for the following rack equipment:
Response:
- A. 2x 15A Circuit @ 230V Circuit
- B. 3x 15A @ 120V Circuit
- C. 1x 30A @ 230V Circuit
- D. 2x 20A Circuit @ 120V Circuit
Answer: A
NEW QUESTION # 84
Which document provides a common language for communicating with teams from different industries?
Response:
- A. Standards
- B. Project documentation
- C. Meeting notes
- D. Manufacturer documentation
Answer: A
NEW QUESTION # 85
Under what circumstance would a designer need to generate a Request for Information (RFI) form on a project?
Response:
- A. There is a mis-match between a diagram and a description on the project
- B. There is a site issue having to do with the concrete footers
- C. The owner has approved a change in types of flat panel displays
- D. The general contractor has changed the project schedule and timeline
Answer: A
NEW QUESTION # 86
What should be included in the AV specifications to further describe the system components?
Response:
- A. Connector types, amount of conduit used, signal path
- B. Ergonomics, RF and IR reception, heat loads, signal separation
- C. Codes, references, shop drawings, commissioning & testing requirements
- D. Equipment manufacturer, serial number, number of USB ports
Answer: C
NEW QUESTION # 87
Which of the following is a mitigation strategy for addressing security risks introduced by AV systems?
Response:
- A. Hiring a security expert
- B. Building a firewall
- C. Putting AV systems on a VLAN
- D. Setting all passwords to "password"
Answer: C
NEW QUESTION # 88
A customer needs to interconnect two buildings on their campus. Your AV design requires 4 network connections between the buildings. What is the smallest conduit that the customer would need to run between the buildings?
Response:
- A. 1/2"
- B. 3/4"
- C. 1"
- D. 1 1/4"
Answer: C
NEW QUESTION # 89
In an AV project involving a courtroom, sightlines from the jury box are obscured by an architectural feature. How should the issue be addressed?
Response:
- A. Instruct the lead technician to request a construction change directive to address the problem
- B. Consult with the end user on the best way to address the obscurity
- C. Move the required equipment to an unobscured location
- D. Generate a request for information
Answer: D
NEW QUESTION # 90
......