To prepare for the ATLASSIAN ACP-610 exam, candidates can take advantage of a variety of resources, including online training courses, self-paced study materials, and practice exams. The training courses cover all the topics that are included in the exam and provide hands-on experience in managing Jira projects in data center environments. The self-paced study materials include documentation, guides, and tutorials that can help candidates deepen their understanding of Jira project management. The practice exams are designed to simulate the actual exam experience and provide candidates with an opportunity to test their knowledge and identify areas where they need to improve. Overall, the ATLASSIAN ACP-610 exam is an excellent way for professionals to demonstrate their expertise in managing Jira projects in data center environments and advance their careers in this field.

 

NEW QUESTION # 38
Darren wants to analyze the performance of his support teams. Less time in the Waiting for Support status indicates optimal team performance. The report should provide a way to dynamically analyze not only specific days but also specific time frames. Which report provides this information?

  • A. Created vs Resolved Issues Report
  • B. Resolution Time Report
  • C. Average Age Report
  • D. Recently Created Issues Report
  • E. Control Chart

Answer: E

Explanation:
Explanation
A Control Chart is the best report to provide the information that Darren wants. A Control Chart shows the cycle time or lead time for your team's issues, broken down by the time spent in each status. It helps you identify whether data from the current process can be used to determine future performance. Less time in the Waiting for Support status indicates optimal team performance, as it means that the issues are being addressed promptly and efficiently. A Control Chart also provides a way to dynamically analyze not only specific days but also specific time frames, by using the date range selector and the zoom feature. You can also filter the chart by issue type, assignee, label, or any other field. References: Managing Jira Projects Data Center and Server: Certification Bundle, [Control Chart | Jira Software Cloud]


NEW QUESTION # 39
Project DEV was just created and has zero issues. It uses the simplified workflow that is not shared.
You are a project administrator in DEV.
Which workflow change im.si definitely he escalated to a Jira administrator?

  • A. remove the in Progress status
  • B. update the Priority field during a transition
  • C. add two existing statuses
  • D. delete a Global transition
  • E. change the initial status of the workflow

Answer: D

Explanation:
Explanation
A global transition is a transition that can be triggered from any status in the workflow. Deleting a global transition may affect the workflow logic and the ability to move issues between statuses. Therefore, only a Jira administrator can delete a global transition. The other actions can be performed by a project administrator in a simplified workflow that is not shared. References: :
https://support.atlassian.com/jira-software-cloud/docs/what-are-workflows/
https://support.atlassian.com/jira-software-cloud/docs/configure-a-simplified-workflow/


NEW QUESTION # 40
Kim needs a single dashboard gadget that displays the following information for issues in her project:
* the total count of all issues
* the total count of each issue type
* the distribution of each issue type as a percentage
* a graphical chart display of that percentage
Which gadget meets this need?

  • A. Two Dimensional Filter Statistics
  • B. Heat Map
  • C. Filter Results
  • D. Issues in progress
  • E. Issue Statistics

Answer: E

Explanation:
Explanation
The gadget that meets Kim's need is the Issue Statistics gadget. This gadget displays the collection of issues returned from a filter, broken down by a field. Kim can configure the gadget to use her project as the filter, and the issue type as the field. The gadget will then show the following information for issues in her project:
the total count of all issues
the total count of each issue type
the distribution of each issue type as a percentage
a graphical chart display of that percentage
The other gadgets are not suitable because:
The Heat Map gadget displays issues from a project or filter, grouped by a statistic type, in a heat map format. Issues can be grouped by any statistic type (e.g. Status, Priority, Assignee, etc). However, this gadget does not show the total count of all issues, nor the distribution of each issue type as a percentage.
The Two Dimensional Filter Statistics gadget displays issues from a filter in a table format, where each cell shows the number of issues for a given combination of two statistics types (e.g. Status vs Priority, Assignee vs Issue Type, etc). This gadget does not show the total count of all issues, nor a graphical chart display of that percentage.
The Filter Results gadget displays the results of an issue filter on the dashboard. This gadget does not show any summary or breakdown of the issues by any field, nor a graphical chart display of that percentage.
The Issues in Progress gadget displays all issues that are in progress and assigned to the user viewing the dashboard. This gadget does not show any information about other issues or issue types in the project, nor a graphical chart display of that percentage.
References: Use dashboard gadgets, Gadgets for Jira applications


NEW QUESTION # 41
Which two can project administrators associate with project roles? (Choose two.)

  • A. Individual users
  • B. Groups
  • C. Application access
  • D. Project permissions
  • E. Global permissions
  • F. Security levels

Answer: B,F


NEW QUESTION # 42
You have all the necessary permissions to transition issues on your board. There are no conditions or validators. One column has two statuses mapped to it You want to drag an issue into that column. Which statement is true?

  • A. You can drop it into either pop-up window.
  • B. You can drop it only into the bottom status.
  • C. You can drop it only into the top status.
  • D. You can drop it into either status
  • E. You cannot drop it into either status.

Answer: D


NEW QUESTION # 43
You want to update a workflow that is not shared.
You are a project administrator and "Extended project administration" is enabled.
Which two actions can you complete? (Choose two.)

  • A. Add a condition to limit who can approve issues,
  • B. Delete the Review status from Jira
  • C. Delete transitions from the workflow.
  • D. Add new transitions to the workflow.
  • E. Add a field to a transition screen.

Answer: C,D


NEW QUESTION # 44
A scrum team asks you for a single comprehensive list of issues that were completed in the last sprint-Additionally, they need to know:
* the story points associated with each completed issue
* the issue type of each completed issue
* the description of each issue that has not been completed
Which report or gadget provides the required information?

  • A. Burndown Chart report
  • B. Created vs Resolved
  • C. Filter Results gadget
  • D. Sprint Health Gadget
  • E. Sprint Report
  • F. Chart gadget

Answer: E

Explanation:
Explanation
A Sprint Report is the best report to provide a single comprehensive list of issues that were completed in the last sprint. A Sprint Report shows the scope, status, and completion date of each sprint. It also displays a breakdown of the completed, incomplete, and added issues in the sprint. The team can see the story points associated with each completed issue, as well as the issue type of each completed issue. They can also see the description of each issue that has not been completed by clicking on the issue key or summary. A Sprint Report also helps to track the team's performance and identify any scope changes during the sprint. References: Managing Jira Projects Data Center and Server: Certification Bundle, [Sprint Report | Jira Software Cloud]


NEW QUESTION # 45
A project uses two issue types named Task and Sub-task which share the workflow shown below.

What is the maximum number of screens that can be used in the current project configuration?

  • A. 0
  • B. 1
  • C. 2
  • D. 3
  • E. 4

Answer: A


NEW QUESTION # 46
You manage multiple projects which share a notification scheme. For the Issue Moved event, you want to notify only a particular individual. That individual needs to be selected by other users.
Which value should be used for the Issue Moved event?

  • A. Current User
  • B. Single User
  • C. Single Email Address
  • D. Developers project role
  • E. User Custom Field Value
  • F. Component Lead

Answer: B


NEW QUESTION # 47
Development team A is consistently overestimating the work they can complete per sprint. They want to be able to compare work committed and work completed in sprints over time. Which single report provides this information?

  • A. Cumulative Flow Diagram
  • B. Created vs Resolved Issues Report
  • C. Control Chart
  • D. Velocity Chart
  • E. Sprint Report

Answer: D

Explanation:
Explanation
The Velocity Chart is the best report to compare work committed and work completed in sprints over time. It shows the average amount of work that a team can complete in a sprint, based on the historical data of previous sprints. It also shows how much work was planned and how much was actually completed in each sprint. By looking at the Velocity Chart, a team can see if they are overestimating or underestimating their capacity, and adjust their planning accordingly. Therefore, option E is correct. References: Velocity Chart, Managing Jira Projects Data Center and Server: Certification Bundle


NEW QUESTION # 48
Currently, the Done column of the Finance board shows all issues ever completed, regardless of age. Now, the team wants to do a periodic clean-up of the Done column.
* They want to do the clean-up whenever it is needed on an ad-hoc basis.
* They want to be able to report on all the issues that were removed during each clean-up.
Which solution meets their need?

  • A. exclude issues in Done status from the board filter
  • B. exclude issues in Done status via a sub-filter
  • C. remove issues as needed using the Release link
  • D. exclude issues where Resolution != EMPTY from the board filter

Answer: C

Explanation:
Explanation
The team can use the Release link to remove issues as needed from the Done column. This will create a version in the project that contains all the issues that were removed, and the team can use the version report to see the details of each clean-up. Excluding issues in Done status from the board filter or via a sub-filter will not remove them from the Done column, but only hide them from view. Excluding issues where Resolution != EMPTY from the board filter will also hide issues from other columns that have a resolution set, which is not desired. References: [Releasing a version], [Managing Jira Projects Data Center and Server: Certification Bundle]


NEW QUESTION # 49
As a project administrator, what changes can you make to the project sidebar?

  • A. display project team members
  • B. display project descriptions
  • C. add a URL and link text
  • D. remove links to Reports
  • E. change the background color

Answer: D


NEW QUESTION # 50
Security levels have already been configured in the Legal project's issue security scheme.
Now Dave needs to be able to set a particular security level on an issue in the Legal project. Identify three prerequisites for him to be able to do this. (Choose three.)

  • A. Dave must be assigned to that particular security level.
  • B. Dave must be the project administrator of the Legal project.
  • C. Dave must have a valid Jira Software license.
  • D. Dave must have the Set Issue Security permission in the Legal project.
  • E. Issue-level security must be globally enabled by a Jira administrator.
  • F. Dave must have access to the Legal project.

Answer: A,D,E


NEW QUESTION # 51
The release manager is requesting a list of all issues included in a particular sprint. Which report will provide this information?

  • A. Control Chart
  • B. Average Age Report
  • C. Sprint Report
  • D. Version Report
  • E. Release Burndown

Answer: C

Explanation:
Explanation
A Sprint Report is the best report to provide a list of all issues included in a particular sprint. A Sprint Report shows the scope, status, and completion date of each sprint. It also displays a breakdown of the completed, incomplete, and added issues in the sprint. The release manager can easily view the list of incomplete issues in the Issue Navigator by clicking on the View in Issue Navigator link at the bottom of the report. A Sprint Report also helps to track the team's performance and identify any scope changes during the sprint. References: Managing Jira Projects Data Center and Server: Certification Bundle, [Sprint Report | Jira Software Cloud]


NEW QUESTION # 52
The team wants to flag issues using a category. Their requirements are:
* more than one category value can be selected on an issue
* new category values can be added by any user
* category values can be selected via a dropdown menu
* category values can be re-used across all projects
Which field meets their requirements?

  • A. component
  • B. checkboxes
  • C. text field
  • D. label
  • E. user picket

Answer: D

Explanation:
Explanation
The label field meets the team's requirements for flagging issues using a category. Labels are a type of custom field that allow users to add one or more descriptive tags to issues. Users can add new labels on the fly, and select existing labels from a dropdown menu. Labels can be re-used across all projects, and can be searched and filtered easily. A text field does not allow multiple values or a dropdown menu. A component does not allow multiple values or adding new values by any user. A user picker does not allow multiple values or adding new values byany user. Checkboxes do not allow adding new values by any user. References: [Adding, removing and searching for labels], [Managing Jira Projects Data Center and Server: Certification Bundle]


NEW QUESTION # 53
You want a built-in report that meets these requirements:
- shows the results of a saved filter
- groups the results by priority and shows a progress bar for each priority
- displays issue status and resolution
Which report should you use?

  • A. User Workload Report
  • B. Recently Created Issues Report
  • C. Resolution Time Report
  • D. Time Tracking Report
  • E. Single Level Group By Report
  • F. Created vs. Resolved Issues Report

Answer: B


NEW QUESTION # 54
A product owner is responsible for two scrum teams. He needs to:
* see a snapshot displaying key sprint information like time elapsed and percentage of scope change
* monitor the overall progress of the next release to determine if it will ship on time Which two gadgets will show this information? (Choose two.)

  • A. Version Report
  • B. Projects
  • C. Activity Stream
  • D. Sprint Health Gadget
  • E. Filter Results
  • F. Issues in progress

Answer: A,D

Explanation:
Explanation
The Version Report and the Sprint Health Gadget are two gadgets that can show the information that the product owner needs. The Version Report shows the progress of a version by comparing the estimated amount of work to the completed work. The report also shows a projected release date based on the team's average velocity. The product owner can use this report to monitor the overall progress of the next release and determine if it will ship on time. The Sprint Health Gadget shows a snapshot of key sprint information such as time elapsed, percentage of scope change, sprint goal, and team members' availability. The product owner can use this gadget to see how each scrum team is performing in their current sprint and identify any issues or risks. References: Managing Jira Projects Data Center and Server: Certification Bundle, Version Report, Sprint Health Gadget


NEW QUESTION # 55
A project was created with a shared configuration. Which two configurations were shared? (Choose two.

  • A. project role membership
  • B. component lead assignments
  • C. transition screens
  • D. versions
  • E. project permissions

Answer: C,E

Explanation:
Explanation
When a project is created with a shared configuration, it inherits the configurations of an existing project. This includes the workflow, issue types, screens, fields, permissions, notifications, and schemes associated with them. However, the component lead assignments and versions are specific to each project and are not shared.
Therefore, the correct answer is C and E. References: Creating a project, Configuring projects


NEW QUESTION # 56
You are helping a manager to translate business requirements into a Jira project configuration. The manager wants users to indicate which systems are impacted by a bug. You are unsure if systems should be configured as components or as a custom field.
Select two situations in which components must definitely be used rather than a custom field. (Choose two.)

  • A. Systems must be exportable to CSV.
  • B. Systems must have a default value.
  • C. Systems must be required on the screen.
  • D. Assignee must be set based on the selected system.
  • E. Systems must be managed by project administrators.
  • F. Users must be able to select multiple systems.

Answer: C,D


NEW QUESTION # 57
......


Atlassian ACP-610 is a certification exam that specializes in managing Jira projects for data center. Jira is a software tool that is widely used across industries to manage project tasks, issues and workflows. With data center, the software tool can be scaled and deployed across multiple servers, making it suitable for large enterprises with complex project structures. The ACP-610 exam assesses the candidate's understanding of Jira project management, data center infrastructure, and administrative tasks.

 

ACP-610 Premium PDF & Test Engine Files with 77 Questions & Answers: https://www.freecram.com/ATLASSIAN-certification/ACP-610-exam-dumps.html

Current ACP-610 Exam Dumps [2024] Complete ATLASSIAN Exam Smoothly: https://drive.google.com/open?id=1_krwUnoGeewUJ_vEXwmDO2YjH32gH30Y

0
0
0
10