NEW QUESTION # 75
Which test verifies a signal can travel from one end of the cable to the other?
Response:
- A. Insulation
- B. Continuity
- C. Polarity
- D. Impedance
Answer: D
NEW QUESTION # 76
During the handshake process, bytes from the EDID table are sent to _____.
Response:
- A. sink devices
- B. source devices
Answer: B
NEW QUESTION # 77
What are the methods used to cool an AV equipment rack?
Select all that apply.
Response:
- A. Decompression
- B. Pressurization
- C. Evacuation
- D. Refrigeration
Answer: B,C
NEW QUESTION # 78
Which diagram is used for positioning mounted equipment within a rack?
Response:
- A. A rack building diagram
- B. A rack mounting diagram
- C. A rack system diagram
- D. A rack elevation diagram
Answer: D
NEW QUESTION # 79
How can you access regional codes for safety procedures?
Response:
- A. Check with local residents
- B. Check websites of manufacturers
- C. Check websites of standards organizations
- D. Check with the client
Answer: C
NEW QUESTION # 80
Which of the following is a compiled program?
Response:
- A. Inventory of IP addresses
- B. DVD titles
- C. RAW codec
- D. Raw code
Answer: D
NEW QUESTION # 81
When pulling cable in a commercial building, what is a major concern?
Response:
- A. Using cable that is approved/rated
- B. How efficiently the cable can be pulled
- C. The friction coefficient of the cable lubricant
- D. Value of cable being installed
Answer: A
NEW QUESTION # 82
What is the first step in conducting a technical site survey?
Response:
- A. Setting up your GPS with the site location
- B. Ordering the equipment from the warehouse
- C. Recording model and serial numbers of all equipment
- D. Reviewing drawings with the AV designer
Answer: D
NEW QUESTION # 83
When training a customer on the operation of a touch panel interface, an example that the GUI is a good design that meets the customer's needs:
[Perform Systems Closeout/Provide Training on Equipment Operation]
Response:
- A. The customer wants only a few changes
- B. The customer can easily step in and use the Touch Panel with little explanation
- C. The customer requires intensive training on the operation of the Touch panel
- D. The customer thinks the panel looks cool
Answer: B
NEW QUESTION # 84
Which of the following choices lists the correct pinouts for the T-568A end of a crossover network cable (pin 1-8):
Response:
- A. Br, WBr, Or, WB, B, WOr, GR, WGr
- B. Gr, WGr, WOr, B, WB, Or, WBr, Br
- C. WGr, Gr, WOr, B, WB, Or, WBr, Br
- D. WOr, Or, WGr, B, WB, Gr, WBr, B
Answer: C
NEW QUESTION # 85
When making a 2 inch hole in a piece of thin sheet metal, what is the BEST tool to use.
Response:
- A. Carbide drill bit
- B. Metal punch
- C. Stepped drill bit
- D. Hole saw
Answer: B
NEW QUESTION # 86
What confirms a network cable tester is in good working order?
Response:
- A. A functional category cable
- B. A pink noise generator
- C. A reflectometer
- D. A null modem cable
Answer: A
NEW QUESTION # 87
If a fuse blows and you suspect there is a problem with high-voltage (120 V AC) wiring, who should you contact immediately?
Response:
- A. Design consultant
- B. Manufacturer's rep
- C. Licensed electrician
- D. Video engineer
Answer: C
NEW QUESTION # 88
What will a stakeholder analysis help you identify?
Response:
- A. The original timeline for the project
- B. The client's concerns and fears about the AV system
- C. The GC's budget for the AV system
- D. The changes that were made to the architectural drawings
Answer: B
NEW QUESTION # 89
What is the primary reason an AV installer should attend weekly construction meetings?
Response:
- A. Identify changes that will affect the AV installation
- B. Find out when the cafeteria is open
- C. Learn about safety requirements
- D. Establish relationships with allied trade teams
Answer: A
NEW QUESTION # 90
Which component would you use to distribute video from multiple sources to many displays or in different zones?
Response:
- A. Distribution amplifier
- B. Matrix switcher
- C. Scaler
- D. Scan converter
Answer: B
NEW QUESTION # 91
Why is it a good idea for the AV installer to provide end user training on a new system?
Response:
- A. Most state codes require service after the sale
- B. Many union contracts require training on new equipment and processes
- C. Good opportunity to identify punch or defects list items
- D. Reduces the number of service calls and damaged equipment caused by user error
Answer: D
NEW QUESTION # 92
How would a commissioning technician establish substantial completion/practical completion?
Response:
- A. Complete a request for changes form, filing an RFQ
- B. Generate a list of all damaged equipment, setting up the DSP
- C. Generate a punch or defects list, getting architects to sign off on repairs
- D. Complete all preliminary tests, confirm systems installation and readiness for final test
Answer: D
NEW QUESTION # 93
......